Upgrade and evolution of the ad target beam imaging system at CERN: a two-year performance analysis
During CERN’s Long Shutdown 2 (LS2) in 2022, the Anti-Proton Decelerator (AD) target area underwent major renovations, including a significant upgrade to its beam imaging system. The previous tube-based camera, used in a high-radiation environment, had limitations in sensitivity and resolution for continuous measurements. The upgraded design uses an innovative in-air light-emitting screen mechanically coupled to the AD target, monitored by a digital camera through a 20-meter optical line from a radiation-safe zone. This setup improves accessibility during beam operation and enhances measurement capabilities. Over two years of operation, several crucial modifications were made. A key change was transitioning from a scintillation material screen to an Optical Transition Radiation (OTR) screen, though this created new challenges with background interference. To address temperature-dependent calibration variations, an automated calibration mechanism was developed, utilizing advanced image analysis algorithms for real-time adjustments. This paper discusses these developments, challenges, solutions, and future optimization opportunities for the AD facility’s evolving experimental needs.
Authors
- Manuel Gonzalez-Berges
- Stephane Burger
- Federico Roncarolo
- Javier Martínez Samblas
Publication Details
- Journal
- CERN Bulletin
- Published
- 2026-01-20
- DOI
- https://doi.org/10.18429/jacow-ibic2025-tupco17
- Primary Topic
- Particle Detector Development and Performance
- Type
- article
- Field-Weighted Citation Impact
- 0.00