Beam Instrumentation for the new linear accelerator at the Canadian Light Source

The Canadian Light Source (CLS) linear accelerator (linac) serves as the injector for the 2.9 GeV synchrotron. The original linac, which was installed in the 1960's, was replaced in 2024. The new 3000.24 MHz linac was designed and built by RI Research Instruments GmbH. The linac makes use of a 90 kV thermionic source, three 5m long accelerating S-band structures and a SLED pulse compressor system to accelerate electrons to 250 MeV. The initial beam instrumentation included a faraday cup, yag screens, beam position monitors and fast current transformers. During the course of commissioning directional couplers and microphones were added to provide insight into the location of RF breakdowns. This paper will provide an overview of the new linear accelerator and our experience commissioning the new equipment.

Authors

Publication Details

Journal
JACOW
Published
2026-01-20
DOI
https://doi.org/10.18429/jacow-ibic2025-mopmo15
Primary Topic
Particle Accelerators and Free-Electron Lasers
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Beam Instrumentation for the new linear accelerator at the Canadian Light Source

Michael Bree, T. Batten, Shervin Saadat, E. Nebot et al.
JACOW
Particle Accelerators and Free-Electron Lasers
article

Beam Instrumentation for the new linear accelerator at the Canadian Light Source

Michael Bree, T. Batten, Shervin Saadat, E. Nebot, Chelsea-Lea Randall, Iaroslav Kolmakov
article en

Abstract

The Canadian Light Source (CLS) linear accelerator (linac) serves as the injector for the 2.9 GeV synchrotron. The original linac, which was installed in the 1960's, was replaced in 2024. The new 3000.24 MHz linac was designed and built by RI Research Instruments GmbH. The linac makes use of a 90 kV thermionic source, three 5m long accelerating S-band structures and a SLED pulse compressor system to accelerate electrons to 250 MeV. The initial beam instrumentation included a faraday cup, yag screens, beam position monitors and fast current transformers. During the course of commissioning directional couplers and microphones were added to provide insight into the location of RF breakdowns. This paper will provide an overview of the new linear accelerator and our experience commissioning the new equipment.

JACOW
Affordable and clean energy
Openalex Percentile: Top 84%
Particle Accelerators and Free-Electron Lasers
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.