Stability analysis of a 9-level boulder-filled slope reinforced with anti-slide piles

The secondary excavation of existing slopes for expressway widening in mountainous regions often encounters giant boulders embedded within the slopes, posing significant stability challenges, particularly during anti-slide pile construction. This study investigates the stability of boulder-embedded slopes throughout the anti-slide pile construction process using finite element numerical simulation, based on a highway widening project. The results demonstrate that the spatial distribution of boulders is a critical factor controlling slope stability. Boulders located in the upper-middle and lower-middle parts of the slope can enhance stability during different stages of anti-slide pile drilling by increasing the shear strength of the soil mass and providing a confining effect; whereas shallow boulders adversely affect stability due to their self-weight effects. Furthermore, it was found that the presence of boulders behind the pile alignment induces significant plastic strain zones in the surrounding soil during drilling, which is detrimental to excavation stability. This investigation concludes that the influence of boulder distribution and its dynamic interaction with anti-slide pile construction phases must be carefully considered in the design and construction of slope widening works.

Authors

Institutions

Publication Details

Journal
All Earth
Published
2026-01-19
DOI
https://doi.org/10.1080/27669645.2026.2617702
Primary Topic
Landslides and related hazards
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Stability analysis of a 9-level boulder-filled slope reinforced with anti-slide piles

Baoshuai Liu, Li Xiong, Guowei Li, Yongquan Li et al.
All Earth
Landslides and related hazards
article

Stability analysis of a 9-level boulder-filled slope reinforced with anti-slide piles

Baoshuai Liu, Li Xiong, Guowei Li, Yongquan Li, Yang Zhou
article en

Abstract

The secondary excavation of existing slopes for expressway widening in mountainous regions often encounters giant boulders embedded within the slopes, posing significant stability challenges, particularly during anti-slide pile construction. This study investigates the stability of boulder-embedded slopes throughout the anti-slide pile construction process using finite element numerical simulation, based on a highway widening project. The results demonstrate that the spatial distribution of boulders is a critical factor controlling slope stability. Boulders located in the upper-middle and lower-middle parts of the slope can enhance stability during different stages of anti-slide pile drilling by increasing the shear strength of the soil mass and providing a confining effect; whereas shallow boulders adversely affect stability due to their self-weight effects. Furthermore, it was found that the presence of boulders behind the pile alignment induces significant plastic strain zones in the surrounding soil during drilling, which is detrimental to excavation stability. This investigation concludes that the influence of boulder distribution and its dynamic interaction with anti-slide pile construction phases must be carefully considered in the design and construction of slope widening works.

All EarthVol. 38(1)
Hohai University (CN), Henan University of Technology (CN), Construction Development (Qatar) (QA)
Sustainable cities and communities
Openalex Percentile: Top 88%
Landslides and related hazards
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Stability analysis of a 9-level boulder-filled slope reinforced with anti-slide piles — Baoshuai Liu, Li Xiong, et al. · All Earth (2026) | TGRS Research Map | TGRS