Codify, Condition, Capacitate: Expert Perspectives on Institution-First Blockchain–BIM Governance for PPP Transparency in Nigeria

Road infrastructure underpins Nigeria’s economic competitiveness, yet Public–Private Partnership (PPP) performance is constrained not by inadequate legislation but by persistent weaknesses in enforcement and governance. Transparency deficits across procurement, design management, certification, and toll-revenue reporting have produced chronic delays, cost overruns, and declining public trust. This study offers the first empirical investigation of blockchain–Building Information Modelling (BIM) integration as a transparency-enhancing mechanism within Nigeria’s PPP road sector, focusing on Lagos State. Using a qualitative design, ten semi-structured interviews with stakeholders across the PPP lifecycle were thematically analysed to diagnose systemic governance weaknesses and assess the contextual feasibility of digital innovations. Findings reveal entrenched opacity rooted in weak enforcement, discretionary decision-making, and informal communication practices—including biased bidder evaluations, undocumented design alterations, manipulated certifications, and toll-revenue inconsistencies. While respondents recognised BIM’s potential to centralise project information and blockchain’s capacity for immutable records and smart-contract automation, they consistently emphasised that technological benefits cannot be realised absent credible institutional foundations. The study advances an original theoretical contribution: the Codify–Condition–Capacitate framework, which explains the institutional preconditions under which digital governance tools can improve transparency. This framework argues that effectiveness depends on: codifying digital standards and legal recognition; conditioning enforcement mechanisms to reduce discretionary authority; and capacitating institutions through targeted training and phased pilots. The research generates significant practical implications for policymakers in Nigeria and comparable developing contexts seeking institution-aligned digital transformation. Methodological rigour was ensured through purposive sampling, thematic saturation assessment, and documented analytical trails.

Authors

Institutions

Publication Details

Journal
FinTech
Published
2026-01-16
DOI
https://doi.org/10.3390/fintech5010010
Primary Topic
Public-Private Partnership Projects
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Codify, Condition, Capacitate: Expert Perspectives on Institution-First Blockchain–BIM Governance for PPP Transparency in Nigeria

Akila Pramodh Rathnasinghe, Barry Gledson, Kenneth Arinze Ede, Ashen Dilruksha Rahubadda
FinTech
Public-Private Partnership Projects
article

Codify, Condition, Capacitate: Expert Perspectives on Institution-First Blockchain–BIM Governance for PPP Transparency in Nigeria

Akila Pramodh Rathnasinghe, Barry Gledson, Kenneth Arinze Ede, Ashen Dilruksha Rahubadda
article en

Abstract

Road infrastructure underpins Nigeria’s economic competitiveness, yet Public–Private Partnership (PPP) performance is constrained not by inadequate legislation but by persistent weaknesses in enforcement and governance. Transparency deficits across procurement, design management, certification, and toll-revenue reporting have produced chronic delays, cost overruns, and declining public trust. This study offers the first empirical investigation of blockchain–Building Information Modelling (BIM) integration as a transparency-enhancing mechanism within Nigeria’s PPP road sector, focusing on Lagos State. Using a qualitative design, ten semi-structured interviews with stakeholders across the PPP lifecycle were thematically analysed to diagnose systemic governance weaknesses and assess the contextual feasibility of digital innovations. Findings reveal entrenched opacity rooted in weak enforcement, discretionary decision-making, and informal communication practices—including biased bidder evaluations, undocumented design alterations, manipulated certifications, and toll-revenue inconsistencies. While respondents recognised BIM’s potential to centralise project information and blockchain’s capacity for immutable records and smart-contract automation, they consistently emphasised that technological benefits cannot be realised absent credible institutional foundations. The study advances an original theoretical contribution: the Codify–Condition–Capacitate framework, which explains the institutional preconditions under which digital governance tools can improve transparency. This framework argues that effectiveness depends on: codifying digital standards and legal recognition; conditioning enforcement mechanisms to reduce discretionary authority; and capacitating institutions through targeted training and phased pilots. The research generates significant practical implications for policymakers in Nigeria and comparable developing contexts seeking institution-aligned digital transformation. Methodological rigour was ensured through purposive sampling, thematic saturation assessment, and documented analytical trails.

FinTechVol. 5(1)
University of Moratuwa (LK), Northumbria University (GB)
Partnerships for the goals
Openalex Percentile: Top 88%
Public-Private Partnership Projects
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.