Safety Monitoring and Deformation Mechanism Analysis of the Dam Abutment Slope Before and After Impoundment of Wudongde Hydropower Station

High-arch dams are usually built in high-ground stress distribution areas. The deformation and stability of the abutment slope are directly related to the safety of the construction and operation of these dams. At present, there are few studies on deformation monitoring and analysis of ultra-high-arch dam abutment slopes. In this study, the surface displacement, anchor stress, and anchor cable’s anchoring force of the dam abutment slope of Wudongde Hydropower Station before and after impounding were monitored, and the safety and deformation mechanism of the dam abutment slope were analyzed, focusing on its change amplitude and change trends. Our results indicate that surface displacement and rock mass deformation at the abutment slopes on both banks are minimal, with stability being maintained following excavation and support works and no abnormal deformation occurring during impoundment. Most anchor bolt stresses remained below 50 MPa, with stable readings exceeding 200 MPa at monitored points. The loss rates of the anchor cable’s anchorage force generally fell within ±15%, with variations primarily occurring prior to excavation and support works. Minimal changes were observed before and after impoundment, indicating overall slope stability. The deformation and stress of the dam abutment slope did not exhibit abnormal changes before or after impounding, and the entire slope is in a stable state. These research results provide a reference for the safe operation of Wudongde Hydropower Station.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2026-01-15
DOI
https://doi.org/10.3390/buildings16020358
Primary Topic
Soil, Finite Element Methods
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Safety Monitoring and Deformation Mechanism Analysis of the Dam Abutment Slope Before and After Impoundment of Wudongde Hydropower Station

Shaowu Zhou, Guoyong Duan, Ning Yang, Yunfei Xiang et al.
Buildings
Soil, Finite Element Methods
article

Safety Monitoring and Deformation Mechanism Analysis of the Dam Abutment Slope Before and After Impoundment of Wudongde Hydropower Station

Shaowu Zhou, Guoyong Duan, Ning Yang, Yunfei Xiang, Peng Lin
article en

Abstract

High-arch dams are usually built in high-ground stress distribution areas. The deformation and stability of the abutment slope are directly related to the safety of the construction and operation of these dams. At present, there are few studies on deformation monitoring and analysis of ultra-high-arch dam abutment slopes. In this study, the surface displacement, anchor stress, and anchor cable’s anchoring force of the dam abutment slope of Wudongde Hydropower Station before and after impounding were monitored, and the safety and deformation mechanism of the dam abutment slope were analyzed, focusing on its change amplitude and change trends. Our results indicate that surface displacement and rock mass deformation at the abutment slopes on both banks are minimal, with stability being maintained following excavation and support works and no abnormal deformation occurring during impoundment. Most anchor bolt stresses remained below 50 MPa, with stable readings exceeding 200 MPa at monitored points. The loss rates of the anchor cable’s anchorage force generally fell within ±15%, with variations primarily occurring prior to excavation and support works. Minimal changes were observed before and after impoundment, indicating overall slope stability. The deformation and stress of the dam abutment slope did not exhibit abnormal changes before or after impounding, and the entire slope is in a stable state. These research results provide a reference for the safe operation of Wudongde Hydropower Station.

BuildingsVol. 16(2)
China Three Gorges Corporation (China) (CN), China Three Gorges University (CN), Beijing Institute of Water (CN), Tsinghua University (CN)
China Three Gorges Corporation
Openalex Percentile: Top 87%
Soil, Finite Element Methods
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.