Implementation of a regulatory agreement instrument for the electric power complex of the Astrakhan region

The electric power industry is a critically important component of the industrial economy, and its stable development and sustainable operation ensures the energy security of the country. The regional aspect of the electric power industry is characterized by close interaction with the end user, where the development of additional mechanisms for participants in interaction is a prerequisite for maintaining the operability of the energy supply system. The issue of implementing a new regulatory agreement instrument for the Astrakhan Region's electric grid complex, designed to eliminate the lack of funds and underfunding of the grid organization, is being considered. To date, the state has not formed an effective management structure and an established procedure for the application of such a tool as a regulatory agreement, the experience of applying such agreements in the Astrakhan region can serve as a basis for the introduction of similar tools in other subjects. The analysis of the main characteristics of the Astrakhan Region's electric power cluster has been carried out, as a result of which the territorial grid organization branch of ROSSETI Yug PJSC – Astrakhanenergo has been identified as the most preferable for applying the mechanism for concluding regulatory agreements. The classification of methods of state regulation of prices (tariffs) for products and services in the electric power industry is characterized. The current problems of activity in the conditions of a critical shortage of funds, including those caused by problems of tariff regulation, are described. Based on the data analysis, it is concluded that it is impossible to reduce the amount of justified debt recognized by the regulatory authority to the network organization through tariff solutions. In the context of the relevant issues, the mechanism of the regulatory agreement is considered as a specialized instrument of personal regulation, used exclusively to overcome the most serious problems and implement large-scale infrastructure projects. The algorithm for developing a draft regulatory agreement for the network organization of ROSSETI Yug PJSC is substantiated.

Authors

Institutions

Publication Details

Journal
VESTNIK OF ASTRAKHAN STATE TECHNICAL UNIVERSITY SERIES ECONOMICS
Published
2025-12-17
DOI
https://doi.org/10.24143/2073-5537-2025-4-79-85
Primary Topic
Advanced Power Generation Technologies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Implementation of a regulatory agreement instrument for the electric power complex of the Astrakhan region

Guriy Alekseevich Kushner, Марина Іванова, Viktor Nikolaevich Pisarev
VESTNIK OF ASTRAKHAN STATE TECHNICAL UNIVERSITY SERIES ECONOMICS
Advanced Power Generation Technologies
article

Implementation of a regulatory agreement instrument for the electric power complex of the Astrakhan region

Guriy Alekseevich Kushner, Марина Іванова, Viktor Nikolaevich Pisarev
article en

Abstract

The electric power industry is a critically important component of the industrial economy, and its stable development and sustainable operation ensures the energy security of the country. The regional aspect of the electric power industry is characterized by close interaction with the end user, where the development of additional mechanisms for participants in interaction is a prerequisite for maintaining the operability of the energy supply system. The issue of implementing a new regulatory agreement instrument for the Astrakhan Region's electric grid complex, designed to eliminate the lack of funds and underfunding of the grid organization, is being considered. To date, the state has not formed an effective management structure and an established procedure for the application of such a tool as a regulatory agreement, the experience of applying such agreements in the Astrakhan region can serve as a basis for the introduction of similar tools in other subjects. The analysis of the main characteristics of the Astrakhan Region's electric power cluster has been carried out, as a result of which the territorial grid organization branch of ROSSETI Yug PJSC – Astrakhanenergo has been identified as the most preferable for applying the mechanism for concluding regulatory agreements. The classification of methods of state regulation of prices (tariffs) for products and services in the electric power industry is characterized. The current problems of activity in the conditions of a critical shortage of funds, including those caused by problems of tariff regulation, are described. Based on the data analysis, it is concluded that it is impossible to reduce the amount of justified debt recognized by the regulatory authority to the network organization through tariff solutions. In the context of the relevant issues, the mechanism of the regulatory agreement is considered as a specialized instrument of personal regulation, used exclusively to overcome the most serious problems and implement large-scale infrastructure projects. The algorithm for developing a draft regulatory agreement for the network organization of ROSSETI Yug PJSC is substantiated.

VESTNIK OF ASTRAKHAN STATE TECHNICAL UNIVERSITY SERIES ECONOMICSVol. 2025(4)
Astrakhan Tatischev State University (RU), Astrakhan State Technical University (RU), Peter the Great St. Petersburg Polytechnic University (RU)
Industry, innovation and infrastructure
Openalex Percentile: Top 39%
Advanced Power Generation Technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.