Framework for leveraging BIM to mitigate disputes in construction projects in Saudi Arabia

Disputes significantly hinder construction projects by affecting timelines, budgets, and stakeholder relations. Building Information Modeling (BIM) offers potential to address these challenges, yet a structured framework linking BIM functionalities to common dispute causes across the project lifecycle remains lacking. This study develops and validates such a framework through engagement with industry practitioners within the Saudi Arabian construction context, where BIM adoption is now mandatory for public-sector projects. Ten leading dispute causes, and their corresponding BIM functionalities were first identified through an extensive literature review. A structured questionnaire was then distributed to practitioners, yielding 87 valid responses, comprising 42 from contractors and 45 from consultants. The Significance Index, descriptive statistics, and Mann–Whitney U test were employed to assess practitioners’ perceptions of BIM’s effectiveness in mitigating specific dispute causes. Results highlight that improved visualization, enhanced collaboration and communication, and improved data management were consistently valued as cross-cutting BIM functionalities across dispute types and project phases. Design coordination and clash detection consistently ranked highest, underscoring their critical role in addressing change orders and design errors. The resulting framework guides owners and practitioners on where to prioritize BIM effort across the project lifecycle to proactively reduce disputes and strengthen project delivery outcomes.

Authors

Institutions

Publication Details

Journal
Frontiers in Built Environment
Published
2026-01-14
DOI
https://doi.org/10.3389/fbuil.2025.1719589
Citations
1
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
25.98

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Framework for leveraging BIM to mitigate disputes in construction projects in Saudi Arabia

Mazen Hassanain, Adel Alshibani, Abdirahman Bashir Muse, Abdullah Alsuhaibani et al.
1 citations
Frontiers in Built Environment
BIM and Construction Integration
25.98
article

Framework for leveraging BIM to mitigate disputes in construction projects in Saudi Arabia

Mazen Hassanain, Adel Alshibani, Abdirahman Bashir Muse, Abdullah Alsuhaibani, Abdirashid Mohamed Muse
article en
1 citations

Abstract

Disputes significantly hinder construction projects by affecting timelines, budgets, and stakeholder relations. Building Information Modeling (BIM) offers potential to address these challenges, yet a structured framework linking BIM functionalities to common dispute causes across the project lifecycle remains lacking. This study develops and validates such a framework through engagement with industry practitioners within the Saudi Arabian construction context, where BIM adoption is now mandatory for public-sector projects. Ten leading dispute causes, and their corresponding BIM functionalities were first identified through an extensive literature review. A structured questionnaire was then distributed to practitioners, yielding 87 valid responses, comprising 42 from contractors and 45 from consultants. The Significance Index, descriptive statistics, and Mann–Whitney U test were employed to assess practitioners’ perceptions of BIM’s effectiveness in mitigating specific dispute causes. Results highlight that improved visualization, enhanced collaboration and communication, and improved data management were consistently valued as cross-cutting BIM functionalities across dispute types and project phases. Design coordination and clash detection consistently ranked highest, underscoring their critical role in addressing change orders and design errors. The resulting framework guides owners and practitioners on where to prioritize BIM effort across the project lifecycle to proactively reduce disputes and strengthen project delivery outcomes.

Frontiers in Built EnvironmentVol. 11
King Fahd University of Petroleum and Minerals (SA)
King Fahd University of Petroleum and Minerals
Industry, innovation and infrastructure
Openalex Percentile: Top 2%
BIM and Construction Integration
25.98
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Framework for leveraging BIM to mitigate disputes in construction projects in Saudi Arabia — Mazen Hassanain, Adel Alshibani, et al. · Frontiers in Built Environment (2026) | TGRS Research Map | TGRS