Application of Integrated Modeling Framework for Managing Downstream Flood Risk in Hydropower Dams under Inflow Uncertainty

Effective reservoir planning and management are critical components in hydrology and water resource management. However, adopting appropriate operation policies after satisfying the downstream hydraulic requirements still needs to be explored. The potential of downstream flooding influenced by uncertainties of the inflow to the reservoir can impede the decision-making strategies of the dam operators, affecting the dam regulation. In this work, we have applied a coupled reservoir operation and hydrodynamic (CRO-Hydro) model for assessing the downstream flood risk under inflow uncertainty. The two models were coupled using a feedback system based on the output of one model. The system utilized downstream flood level data from the hydrodynamic part of the model to trigger the reservoir operation model. This enabled the reservoir to initiate an advance release by discharging water before the occurrence of the flood. Our approach quantifies the advance release using a simulation-optimization model to minimize downstream flood levels while maintaining an acceptable power production efficiency under perfect forecast conditions. A sensitivity analysis of inflow uncertainty, considering the peak flow and time of arrival of peak flow, was conducted to check the downstream flood risk. We demonstrate our methodology in the Ranganadi Hydro Electric Project located in Arunachal Pradesh, India. Results showed that under a perfect forecast, CRO-Hydro successfully lowered the flood levels to keep them below the danger level in the downstream flood-prone section. The sensitivity analysis revealed that the risk is higher with the early arrival of the flood peak compared to the late arrival of the expected flood. Even with a lag of 6 h, the power production efficiency has remained consistently above 85%. Thus, the inflow forecast should prioritize predicting peak flow and the early arrival time for decision-making by dam authorities.

Authors

Institutions

Publication Details

Journal
Journal of Water Resources Planning and Management
Published
2026-01-14
DOI
https://doi.org/10.1061/jwrmd5.wreng-6829
Primary Topic
Water resources management and optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Application of Integrated Modeling Framework for Managing Downstream Flood Risk in Hydropower Dams under Inflow Uncertainty

Dipsikha Devi, Anupal Baruah, Arup Kr. Sarma
Journal of Water Resources Planning and Management
Water resources management and optimization
article

Application of Integrated Modeling Framework for Managing Downstream Flood Risk in Hydropower Dams under Inflow Uncertainty

Dipsikha Devi, Anupal Baruah, Arup Kr. Sarma
article en

Abstract

Effective reservoir planning and management are critical components in hydrology and water resource management. However, adopting appropriate operation policies after satisfying the downstream hydraulic requirements still needs to be explored. The potential of downstream flooding influenced by uncertainties of the inflow to the reservoir can impede the decision-making strategies of the dam operators, affecting the dam regulation. In this work, we have applied a coupled reservoir operation and hydrodynamic (CRO-Hydro) model for assessing the downstream flood risk under inflow uncertainty. The two models were coupled using a feedback system based on the output of one model. The system utilized downstream flood level data from the hydrodynamic part of the model to trigger the reservoir operation model. This enabled the reservoir to initiate an advance release by discharging water before the occurrence of the flood. Our approach quantifies the advance release using a simulation-optimization model to minimize downstream flood levels while maintaining an acceptable power production efficiency under perfect forecast conditions. A sensitivity analysis of inflow uncertainty, considering the peak flow and time of arrival of peak flow, was conducted to check the downstream flood risk. We demonstrate our methodology in the Ranganadi Hydro Electric Project located in Arunachal Pradesh, India. Results showed that under a perfect forecast, CRO-Hydro successfully lowered the flood levels to keep them below the danger level in the downstream flood-prone section. The sensitivity analysis revealed that the risk is higher with the early arrival of the flood peak compared to the late arrival of the expected flood. Even with a lag of 6 h, the power production efficiency has remained consistently above 85%. Thus, the inflow forecast should prioritize predicting peak flow and the early arrival time for decision-making by dam authorities.

Journal of Water Resources Planning and ManagementVol. 152(3)
Indian Institute of Technology Guwahati (IN), University of Alabama (US)
Clean water and sanitation
Openalex Percentile: Top 89%
Water resources management and optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.