Productivity Prediction and Sand Control Optimization for Unconsolidated Sandstone Reservoirs with High Water Cut

The “Double High—Double Extra High” stage of offshore oilfields, where large pumps lift liquids, leads to a rapid rise in water concentration, which triggers a decrease in rock strength and exacerbates the risk of sand production; this leads to a blockage of the reservoir, thus restricting the release of production capacity. In this paper, for the typical weak cementation strength of unconsolidated sandstone of a Class I reservoir in the P oilfield, numerical simulation and indoor experimental methods are utilized to explore the plugging mechanism and law of the water-contenting conditions, with micro-sand and mud conditions, on the screen. Considering the combined effects of reservoir particulate transport plugging and near-well sand control media plugging, the additional pressure drop and skin factor calculation model is constructed, and a dynamic capacity prediction model for sand control wells is formed. By matching the physical properties of the target reservoir and optimizing the sand control method, the production capacity prediction model and the sand control optimization design method for the high water-content period of the unconsolidated sandstone reservoir are finally obtained. The results show that the median sand size of well A1 in the P oilfield Class I reservoir is 220 μm, the sand transportation diameter is about 15–20 m, the serious plugging area near the well is distributed in 2–2.5 m, and the predicted loss of production capacity is about 18%. The use of a foam metal screen can significantly reduce the plugging pressure and increase the flow of crude oil, which is 2.2 and 1.2 times higher than that of the precision mesh and pre-filled screen, respectively. These research results can provide technical support and theoretical guidance for the sustained, efficient, and stable production of sand reservoirs in the Bohai Oilfield.

Authors

Institutions

Publication Details

Journal
Processes
Published
2026-01-09
DOI
https://doi.org/10.3390/pr14020229
Primary Topic
Drilling and Well Engineering
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Productivity Prediction and Sand Control Optimization for Unconsolidated Sandstone Reservoirs with High Water Cut

Bin Chen, Jin Li, Mengying Sun, Shuai Zhang et al.
Processes
Drilling and Well Engineering
article

Productivity Prediction and Sand Control Optimization for Unconsolidated Sandstone Reservoirs with High Water Cut

Bin Chen, Jin Li, Mengying Sun, Shuai Zhang, Changyin Dong
article en

Abstract

The “Double High—Double Extra High” stage of offshore oilfields, where large pumps lift liquids, leads to a rapid rise in water concentration, which triggers a decrease in rock strength and exacerbates the risk of sand production; this leads to a blockage of the reservoir, thus restricting the release of production capacity. In this paper, for the typical weak cementation strength of unconsolidated sandstone of a Class I reservoir in the P oilfield, numerical simulation and indoor experimental methods are utilized to explore the plugging mechanism and law of the water-contenting conditions, with micro-sand and mud conditions, on the screen. Considering the combined effects of reservoir particulate transport plugging and near-well sand control media plugging, the additional pressure drop and skin factor calculation model is constructed, and a dynamic capacity prediction model for sand control wells is formed. By matching the physical properties of the target reservoir and optimizing the sand control method, the production capacity prediction model and the sand control optimization design method for the high water-content period of the unconsolidated sandstone reservoir are finally obtained. The results show that the median sand size of well A1 in the P oilfield Class I reservoir is 220 μm, the sand transportation diameter is about 15–20 m, the serious plugging area near the well is distributed in 2–2.5 m, and the predicted loss of production capacity is about 18%. The use of a foam metal screen can significantly reduce the plugging pressure and increase the flow of crude oil, which is 2.2 and 1.2 times higher than that of the precision mesh and pre-filled screen, respectively. These research results can provide technical support and theoretical guidance for the sustained, efficient, and stable production of sand reservoirs in the Bohai Oilfield.

ProcessesVol. 14(2)
China National Offshore Oil Corporation (China) (CN), China University of Petroleum, East China (CN)
Openalex Percentile: Top 93%
Drilling and Well Engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.