Development of an integrated hybrid risk assessment system for railway construction projects

Railway infrastructure is vulnerable to a wide range of uncertainties resulting from organizational, financial, environmental, and technological concerns that can have a substantial impact on project outcomes. Risk assessment and management are essential for the complex nature of the railway system, comprising interconnected subsystems like rolling stock and infrastructure. It’s critical to comprehend the principles of risk assessment and put them into practice while implementing railway construction projects. In this regard, adoption of the ‘Risk Based-Decision Support Systems’ are expected to enhance railway system management. In this respect, this study enriches the decision-making process with 5 main criterion and 21 indicators, which helps to evaluate the risk level of a construction project using a hybrid model by using AHP-Fuzzy Comprehensive Evaluation and Monte-Carlo Method. Furthermore, the evaluation method was tested for a candidate railway project. To the best of our knowledge, this integrated approach has not been used to assess risks associated with railway construction projects and serve as the cornerstone for well-informed risk decision-making. This study has filled this gap by utilizing an integrated risk assessment method in conjunction with a thorough literature assessment of risk evaluation models and evaluation criterias in the field of construction risk management.

Authors

Institutions

Publication Details

Journal
Discover Civil Engineering
Published
2026-01-06
DOI
https://doi.org/10.1007/s44290-025-00369-8
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Development of an integrated hybrid risk assessment system for railway construction projects

Berna Çalışkan
Discover Civil Engineering
Construction Project Management and Performance
article

Development of an integrated hybrid risk assessment system for railway construction projects

Berna Çalışkan
article en

Abstract

Railway infrastructure is vulnerable to a wide range of uncertainties resulting from organizational, financial, environmental, and technological concerns that can have a substantial impact on project outcomes. Risk assessment and management are essential for the complex nature of the railway system, comprising interconnected subsystems like rolling stock and infrastructure. It’s critical to comprehend the principles of risk assessment and put them into practice while implementing railway construction projects. In this regard, adoption of the ‘Risk Based-Decision Support Systems’ are expected to enhance railway system management. In this respect, this study enriches the decision-making process with 5 main criterion and 21 indicators, which helps to evaluate the risk level of a construction project using a hybrid model by using AHP-Fuzzy Comprehensive Evaluation and Monte-Carlo Method. Furthermore, the evaluation method was tested for a candidate railway project. To the best of our knowledge, this integrated approach has not been used to assess risks associated with railway construction projects and serve as the cornerstone for well-informed risk decision-making. This study has filled this gap by utilizing an integrated risk assessment method in conjunction with a thorough literature assessment of risk evaluation models and evaluation criterias in the field of construction risk management.

Discover Civil EngineeringVol. 3(1)
Istanbul Technical University (TR)
Industry, innovation and infrastructure
Openalex Percentile: Top 95%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Development of an integrated hybrid risk assessment system for railway construction projects — Berna Çalışkan · Discover Civil Engineering (2026) | TGRS Research Map | TGRS