Impact of Ultra-Fast Electric Vehicle Charging on Steady-State Voltage Compliance in Radial Distribution Feeders: A Monte Carlo V–Q Sensitivity Framework

This paper quantifies the steady-state voltage-compliance impact of ultra-fast electric vehicle (EV) charging on the IEEE 33-bus radial distribution feeder. Four practical scenarios are examined by combining two penetration levels (6 and 12 charging points, i.e., ≈20% and ≈40% of PQ buses) with two charger ratings (1 MW and 350 kW per point). Candidate buses for EV station integration are selected through a nodal voltage–reactive sensitivity ranking (∂V/∂Q), prioritizing electrically robust locations. To capture realistic operating uncertainty, a 24-hour quasi-static time-series power-flow assessment is performed using Monte Carlo sampling (N=100), jointly modeling residential-demand variability and stochastic EV charging activation. Across the four cases, the worst-hour minimum voltage (uncompensated) ranges from 0.803 to 0.902 p.u., indicating a persistent under-voltage risk under dense and/or high-power charging. When the expected minimum-hourly voltage violates the 0.95 p.u. limit, a closed-form, sensitivity-guided reactive compensation is computed at the critical bus, and the power flow is re-solved. The proposed mitigation increases the minimum-voltage trajectory by approximately 0.03–0.12 p.u. (about 3.0–12.0% relative to 1 p.u.), substantially reducing the depth and duration of violations. The maximum required reactive support reaches 6.35 Mvar in the most stressed case (12 chargers at 1 MW), whereas limiting the unit charger power to 350 kW lowers both the severity of under-voltage and the compensation requirement. Overall, the Monte Carlo V–Q sensitivity framework provides a lightweight and reproducible tool for probabilistic voltage-compliance assessment and targeted steady-state mitigation in EV-rich radial distribution networks.

Authors

Institutions

Publication Details

Journal
Energies
Published
2026-01-07
DOI
https://doi.org/10.3390/en19020300
Primary Topic
Electric Vehicles and Infrastructure
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Impact of Ultra-Fast Electric Vehicle Charging on Steady-State Voltage Compliance in Radial Distribution Feeders: A Monte Carlo V–Q Sensitivity Framework

Alexander Águila Téllez, Hassan Ortega
Energies
Electric Vehicles and Infrastructure
article

Impact of Ultra-Fast Electric Vehicle Charging on Steady-State Voltage Compliance in Radial Distribution Feeders: A Monte Carlo V–Q Sensitivity Framework

Alexander Águila Téllez, Hassan Ortega
article en

Abstract

This paper quantifies the steady-state voltage-compliance impact of ultra-fast electric vehicle (EV) charging on the IEEE 33-bus radial distribution feeder. Four practical scenarios are examined by combining two penetration levels (6 and 12 charging points, i.e., ≈20% and ≈40% of PQ buses) with two charger ratings (1 MW and 350 kW per point). Candidate buses for EV station integration are selected through a nodal voltage–reactive sensitivity ranking (∂V/∂Q), prioritizing electrically robust locations. To capture realistic operating uncertainty, a 24-hour quasi-static time-series power-flow assessment is performed using Monte Carlo sampling (N=100), jointly modeling residential-demand variability and stochastic EV charging activation. Across the four cases, the worst-hour minimum voltage (uncompensated) ranges from 0.803 to 0.902 p.u., indicating a persistent under-voltage risk under dense and/or high-power charging. When the expected minimum-hourly voltage violates the 0.95 p.u. limit, a closed-form, sensitivity-guided reactive compensation is computed at the critical bus, and the power flow is re-solved. The proposed mitigation increases the minimum-voltage trajectory by approximately 0.03–0.12 p.u. (about 3.0–12.0% relative to 1 p.u.), substantially reducing the depth and duration of violations. The maximum required reactive support reaches 6.35 Mvar in the most stressed case (12 chargers at 1 MW), whereas limiting the unit charger power to 350 kW lowers both the severity of under-voltage and the compensation requirement. Overall, the Monte Carlo V–Q sensitivity framework provides a lightweight and reproducible tool for probabilistic voltage-compliance assessment and targeted steady-state mitigation in EV-rich radial distribution networks.

EnergiesVol. 19(2)
Politecnica Salesiana University (EC)
Universidad Politécnica Salesiana del Ecuador
Openalex Percentile: Top 95%
Electric Vehicles and Infrastructure
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.