Designing out waste implementation in the wall system of residential projects in New Zealand

The construction industry accounts for approximately half of all landfill waste in New Zealand (NZ). Designing out waste (DoW) approach has been introduced to minimise waste generation at the design stage, including five key principles: design for off-site construction, reuse and recovery, materials optimisation, waste-efficient procurement, and design for the future. However, the differential applicability of these principles across various building elements poses significant challenges to their practical implementation, while existing guidelines offer only broad and nonspecific recommendations. This study addresses this gap by investigating the application of DoW principles to wall elements, including framing, insulation, lining, and cladding, in residential construction, a sector that accounts for the largest share of NZ construction activity and where wall systems are the major source of material waste. Through a desktop study and fourteen semi-structured interviews, this research investigates the feasibility of applying each DoW principle to materials used in wall systems. Furthermore, five key project factors influencing DoW implementation were identified: project budget, regulatory compliance, accessibility of waste processing infrastructure, material availability and supply chain collaboration, and technical requirements. These factors highlight the importance of project context in determining which DoW strategies can be effectively adopted. The study offers practical and specific guidance to support more effective integration of DoW strategies from the design stage, ultimately contributing to waste minimisation in residential construction. • Designing out waste (DoW) is a critical approach to minimise construction and demolition waste. • Existing guidelines offer broad and nonspecific recommendations, limiting practical implementation. • Material-specific DoW waste strategies were developed for the New Zealand residential wall system. • Five project factors were identified that influence the applicability and outcomes of DoW implementation. • Findings provide detailed and practical guidance to apply DoW from the design stage of the NZ residential wall system.

Authors

Institutions

Publication Details

Journal
Journal of Building Engineering
Published
2026-01-07
DOI
https://doi.org/10.1016/j.jobe.2026.115226
Primary Topic
Recycled Aggregate Concrete Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Designing out waste implementation in the wall system of residential projects in New Zealand

Niluka Domingo, An Le, Nguyet Tong
Journal of Building Engineering
Recycled Aggregate Concrete Performance
article

Designing out waste implementation in the wall system of residential projects in New Zealand

Niluka Domingo, An Le, Nguyet Tong
article en

Abstract

The construction industry accounts for approximately half of all landfill waste in New Zealand (NZ). Designing out waste (DoW) approach has been introduced to minimise waste generation at the design stage, including five key principles: design for off-site construction, reuse and recovery, materials optimisation, waste-efficient procurement, and design for the future. However, the differential applicability of these principles across various building elements poses significant challenges to their practical implementation, while existing guidelines offer only broad and nonspecific recommendations. This study addresses this gap by investigating the application of DoW principles to wall elements, including framing, insulation, lining, and cladding, in residential construction, a sector that accounts for the largest share of NZ construction activity and where wall systems are the major source of material waste. Through a desktop study and fourteen semi-structured interviews, this research investigates the feasibility of applying each DoW principle to materials used in wall systems. Furthermore, five key project factors influencing DoW implementation were identified: project budget, regulatory compliance, accessibility of waste processing infrastructure, material availability and supply chain collaboration, and technical requirements. These factors highlight the importance of project context in determining which DoW strategies can be effectively adopted. The study offers practical and specific guidance to support more effective integration of DoW strategies from the design stage, ultimately contributing to waste minimisation in residential construction. • Designing out waste (DoW) is a critical approach to minimise construction and demolition waste. • Existing guidelines offer broad and nonspecific recommendations, limiting practical implementation. • Material-specific DoW waste strategies were developed for the New Zealand residential wall system. • Five project factors were identified that influence the applicability and outcomes of DoW implementation. • Findings provide detailed and practical guidance to apply DoW from the design stage of the NZ residential wall system.

Journal of Building EngineeringVol. 119
Massey University (NZ)
Industry, innovation and infrastructure
Openalex Percentile: Top 96%
Recycled Aggregate Concrete Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.