In-Situ Stress Evaluation in an Unlined Pressure Tunnel of a Hydropower in South-Western Part of Norway

Abstract In-situ stress is a key parameter in applied rock mechanics and a governing factor in design of unlined pressure tunnels. In Norway and some other countries, Norwegian thumb rules are commonly applied for the design of unlined pressure tunnels, intended to ensure that internal water pressure remains below the minimum in-situ principal stress. In-situ stress can also be evaluated using geo-mechanical numerical models. However, constructing such models presents challenges, especially in defining representative boundary conditions that best-fit all measurement points. To address this, the authors present an automated two-step optimization approach for obtaining best-fit in-situ stress model. The method is first used in a synthetic model and then applied to Løkjelsvatn Hydropower Project, where in-situ stress measurements are available. Results show that best-fit in-situ stress model can be achieved by integrating two-step optimization approach. Analysis suggests that weakness zones traversing the tunnels hold potential of attenuating stress in the vicinity, requiring careful consideration while orienting unlined pressure tunnel. In current geological setting, stiffness contrast between host rock and weakness zones is about two, but a higher contrast could significantly increase risk of leakages due to hydraulic fracturing. The study recommends using thumb rules mainly for early planning purposes. The manuscript also emphasizes the need for a systematic study of the stress state around weakness zones, so that geological heterogeneity could be technically represented in the geo-mechanical numerical models. The devised method can potentially be applied in locations where hydropower projects are envisaged.

Authors

Institutions

Publication Details

Journal
Rock Mechanics and Rock Engineering
Published
2026-01-06
DOI
https://doi.org/10.1007/s00603-025-05217-w
Citations
1
Primary Topic
Geotechnical Engineering and Analysis
Type
article
Field-Weighted Citation Impact
35.27
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

In-Situ Stress Evaluation in an Unlined Pressure Tunnel of a Hydropower in South-Western Part of Norway

Sanyam Ghimire, Krishna Kanta Panthi
1 citations
Rock Mechanics and Rock Engineering
Geotechnical Engineering and Analysis
35.27
article

In-Situ Stress Evaluation in an Unlined Pressure Tunnel of a Hydropower in South-Western Part of Norway

Sanyam Ghimire, Krishna Kanta Panthi
article en
1 citations

Abstract

Abstract In-situ stress is a key parameter in applied rock mechanics and a governing factor in design of unlined pressure tunnels. In Norway and some other countries, Norwegian thumb rules are commonly applied for the design of unlined pressure tunnels, intended to ensure that internal water pressure remains below the minimum in-situ principal stress. In-situ stress can also be evaluated using geo-mechanical numerical models. However, constructing such models presents challenges, especially in defining representative boundary conditions that best-fit all measurement points. To address this, the authors present an automated two-step optimization approach for obtaining best-fit in-situ stress model. The method is first used in a synthetic model and then applied to Løkjelsvatn Hydropower Project, where in-situ stress measurements are available. Results show that best-fit in-situ stress model can be achieved by integrating two-step optimization approach. Analysis suggests that weakness zones traversing the tunnels hold potential of attenuating stress in the vicinity, requiring careful consideration while orienting unlined pressure tunnel. In current geological setting, stiffness contrast between host rock and weakness zones is about two, but a higher contrast could significantly increase risk of leakages due to hydraulic fracturing. The study recommends using thumb rules mainly for early planning purposes. The manuscript also emphasizes the need for a systematic study of the stress state around weakness zones, so that geological heterogeneity could be technically represented in the geo-mechanical numerical models. The devised method can potentially be applied in locations where hydropower projects are envisaged.

Rock Mechanics and Rock Engineering
Norwegian University of Science and Technology (NO)
Openalex Percentile: Top 2%
Geotechnical Engineering and Analysis
35.27
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.