Waiting for minutes and decades: Public transit and opportunities for reparative planning on Chicago’s far South Side
Public transit is highly inequitable in hyper-segregated Chicago. After being promised for 50 years, a rail extension is finally poised for construction on the far South Side, a majority Black area lacking metro rail service. Using interviews, we examine how riders and residents perceive the long-awaited Red Line Extension and current riding experiences, focusing on time—waiting for buses routinely and waiting for a long-promised project. While the extension is an important step for equity, it is not reparative planning; doubt and frustration expressed by interviewees reflect that they also see equity planning as falling short.
Authors
- Gwendolyn Y. Purifoye (ORCID: https://orcid.org/0000-0001-6870-9380)
- Anson Stewart (ORCID: https://orcid.org/0000-0002-3862-1393)
- Kate Lowe
Institutions
- University of Notre Dame (US)
- University of Illinois Chicago (US)
- Massachusetts Institute of Technology (US)
Publication Details
- Journal
- Urban Studies
- Published
- 2026-01-07
- DOI
- https://doi.org/10.1177/00420980251393550
- Primary Topic
- Urban Planning and Governance
- Type
- article
- Field-Weighted Citation Impact
- 0.00