Proving Breach of Natural Justice in Adjudication Decisions

The aggrieved party may apply to set aside an adjudication decision due to a breach of natural justice, corruption, lack of adjudicator impartiality, or jurisdictional overreach. However, proving such breaches is challenging, as the burden of proof rests on the aggrieved party, and failure to meet this burden results in the enforcement of potentially unjust decisions. This study identifies the evidence required to satisfy this burden under the Malaysia’s statutory adjudication regimes by analyzing 10 Malaysian cases. Findings reveal that breaches of natural justice often involve adjudicators failing to consider defenses, imposing restrictive jurisdictional views, or disregarding submissions. The study evaluates court verdicts to determine whether the evidence presented is material to the breach and which rule of natural justice was violated. Crucially, only material breaches that likely alter adjudication outcomes justify setting aside decisions. These findings provide adjudicators and construction professionals with a clearer understanding of the evidence required to establish breaches of natural justice, improving statutory adjudication efficiency.

Authors

Institutions

Publication Details

Journal
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Published
2026-01-05
DOI
https://doi.org/10.1061/jladah.ladr-1352
Primary Topic
Construction Engineering and Safety
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Proving Breach of Natural Justice in Adjudication Decisions

Farrah Azwanee Aminuddin, Hamizah Liyana Tajul Ariffin, N.A.R. Nik Mohd, Tee Wei Kin et al.
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Construction Engineering and Safety
article

Proving Breach of Natural Justice in Adjudication Decisions

Farrah Azwanee Aminuddin, Hamizah Liyana Tajul Ariffin, N.A.R. Nik Mohd, Tee Wei Kin, Nursyahirah Aliya Mohd Misdon
article en

Abstract

The aggrieved party may apply to set aside an adjudication decision due to a breach of natural justice, corruption, lack of adjudicator impartiality, or jurisdictional overreach. However, proving such breaches is challenging, as the burden of proof rests on the aggrieved party, and failure to meet this burden results in the enforcement of potentially unjust decisions. This study identifies the evidence required to satisfy this burden under the Malaysia’s statutory adjudication regimes by analyzing 10 Malaysian cases. Findings reveal that breaches of natural justice often involve adjudicators failing to consider defenses, imposing restrictive jurisdictional views, or disregarding submissions. The study evaluates court verdicts to determine whether the evidence presented is material to the breach and which rule of natural justice was violated. Crucially, only material breaches that likely alter adjudication outcomes justify setting aside decisions. These findings provide adjudicators and construction professionals with a clearer understanding of the evidence required to establish breaches of natural justice, improving statutory adjudication efficiency.

Journal of Legal Affairs and Dispute Resolution in Engineering and ConstructionVol. 18(2)
University of Technology Malaysia (MY)
Peace, Justice and strong institutions
Openalex Percentile: Top 98%
Construction Engineering and Safety
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.