Optimization of Retaining Ditch Height for Gentle Slope Turning in Inclined Coal Seam Open-pit Mines

Inclined coal-seam open-pit mines with internal dumping commonly reserve an end-side retaining ditch when turning from horizontal advance to along-strike excavation. Selecting a single fixed ditch level is straightforward but ignores year-to-year variability in stripping volumes and haulage distances, which can inflate the combined transportation and secondary stripping costs. This study proposes a two-stage optimization framework for planning the ditch-height trajectory during the turning period. First, a maximum economic ditch height is derived via an economic-compensation model that balances the revenue from overlying coal recoverable after turning against the added costs of longer haulage and increased external dumping, with cost/revenue streams discounted using a compound-interest formulation. Second, within this upper bound, a total-cost minimization model couples annual stripping transportation costs during turning with the secondary stripping cost after turning. The model enforces annual waste-volume balance among inner dumping, ditch storage, and external dumping, preferred waste-flow directions, bounds on ditch height, and limits on height differences between adjacent years. Haulage distances are calculated from centroid locations of stripping and dumping stages extracted from 3DMine, and the resulting dynamic program is solved using a sequential recursion method. A seven-year case study (2023-2029) outputs an optimized fluctuating ditch scheme with yearly ditch heights of 214.5, 190.5, 206.7, 201.3, 189.6, 181.2, and 166.0 m, reducing the cumulative cost by 148.32 million CNY compared with the conventional constant-level ditch plan. The framework offers a practical decision tool for parameterizing retaining ditches and improving the overall economics of gentle-slope turning in inclined coal-seam open-pit mines.

Authors

Institutions

Publication Details

Journal
International Journal of Energy and Environmental Science
Published
2025-12-27
DOI
https://doi.org/10.11648/j.ijees.20251006.14
Primary Topic
Mining Techniques and Economics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimization of Retaining Ditch Height for Gentle Slope Turning in Inclined Coal Seam Open-pit Mines

Mingjia Lv, Ziling Song, Yu Wen, Bo Zhao
International Journal of Energy and Environmental Science
Mining Techniques and Economics
article

Optimization of Retaining Ditch Height for Gentle Slope Turning in Inclined Coal Seam Open-pit Mines

Mingjia Lv, Ziling Song, Yu Wen, Bo Zhao
article en

Abstract

Inclined coal-seam open-pit mines with internal dumping commonly reserve an end-side retaining ditch when turning from horizontal advance to along-strike excavation. Selecting a single fixed ditch level is straightforward but ignores year-to-year variability in stripping volumes and haulage distances, which can inflate the combined transportation and secondary stripping costs. This study proposes a two-stage optimization framework for planning the ditch-height trajectory during the turning period. First, a maximum economic ditch height is derived via an economic-compensation model that balances the revenue from overlying coal recoverable after turning against the added costs of longer haulage and increased external dumping, with cost/revenue streams discounted using a compound-interest formulation. Second, within this upper bound, a total-cost minimization model couples annual stripping transportation costs during turning with the secondary stripping cost after turning. The model enforces annual waste-volume balance among inner dumping, ditch storage, and external dumping, preferred waste-flow directions, bounds on ditch height, and limits on height differences between adjacent years. Haulage distances are calculated from centroid locations of stripping and dumping stages extracted from 3DMine, and the resulting dynamic program is solved using a sequential recursion method. A seven-year case study (2023-2029) outputs an optimized fluctuating ditch scheme with yearly ditch heights of 214.5, 190.5, 206.7, 201.3, 189.6, 181.2, and 166.0 m, reducing the cumulative cost by 148.32 million CNY compared with the conventional constant-level ditch plan. The framework offers a practical decision tool for parameterizing retaining ditches and improving the overall economics of gentle-slope turning in inclined coal-seam open-pit mines.

International Journal of Energy and Environmental ScienceVol. 10(6)
Liaoning Technical University (CN), Guizhou Minzu University (CN), Shaanxi Yulin Energy Group (CN)
Openalex Percentile: Top 35%
Mining Techniques and Economics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.