Mechanical behavior of reservoir bank slope–pile–sheet structures under reservoir operation: Field monitoring and numerical simulation analysis

Long-term fluctuations in reservoir water levels can lead to the deterioration of bank slope materials, representing a key trigger of instability. This study investigated the behavior of a slope-pile-sheet support structure at a site in Chongqing's "Two Rivers and Four Banks" area through an integrated program of field monitoring and numerical simulation. The results demonstrated a strong correlation between slope displacement/settlement and water-level fluctuations, exhibiting a characteristic three-stage process. Rapid drawdown triggered substantial horizontal displacement with a one-month response lag, while settlement primarily occurred during water-level rise. Earth pressure behind the piles exhibited a non-linear R-shaped distribution, with a delayed response in shallow layers and a pronounced local pressure drop at 8 m depth indicative of seepage erosion. The pile bending moment showed a distinct S-shaped profile, with a maximum positive moment (1978.44 kN·m) at the rock-soil interface (13 m) and a negative moment zone below 21 m. The bending moment response also exhibited a one-month lag and was particularly sensitive to rapid drawdown. The identified contraflexure point at 21 m depth provides a basis for pile length optimization. The close agreement between numerical simulations and field data validates the strong hydro-mechanical coupling in the system. This research provides theoretical and practical support for the design and optimization of similar support structures in reservoir bank environments.

Authors

Institutions

Publication Details

Journal
PLoS ONE
Published
2026-01-02
DOI
https://doi.org/10.1371/journal.pone.0339875
Primary Topic
Dam Engineering and Safety
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Mechanical behavior of reservoir bank slope–pile–sheet structures under reservoir operation: Field monitoring and numerical simulation analysis

Zhiwei Cai, Fei Qi, Tongqing Wu, Zhao Xiang et al.
PLoS ONE
Dam Engineering and Safety
article

Mechanical behavior of reservoir bank slope–pile–sheet structures under reservoir operation: Field monitoring and numerical simulation analysis

Zhiwei Cai, Fei Qi, Tongqing Wu, Zhao Xiang, Nianchun Xu, Zhijie Yang, Lei Nie, Yue Wu
article en

Abstract

Long-term fluctuations in reservoir water levels can lead to the deterioration of bank slope materials, representing a key trigger of instability. This study investigated the behavior of a slope-pile-sheet support structure at a site in Chongqing's "Two Rivers and Four Banks" area through an integrated program of field monitoring and numerical simulation. The results demonstrated a strong correlation between slope displacement/settlement and water-level fluctuations, exhibiting a characteristic three-stage process. Rapid drawdown triggered substantial horizontal displacement with a one-month response lag, while settlement primarily occurred during water-level rise. Earth pressure behind the piles exhibited a non-linear R-shaped distribution, with a delayed response in shallow layers and a pronounced local pressure drop at 8 m depth indicative of seepage erosion. The pile bending moment showed a distinct S-shaped profile, with a maximum positive moment (1978.44 kN·m) at the rock-soil interface (13 m) and a negative moment zone below 21 m. The bending moment response also exhibited a one-month lag and was particularly sensitive to rapid drawdown. The identified contraflexure point at 21 m depth provides a basis for pile length optimization. The close agreement between numerical simulations and field data validates the strong hydro-mechanical coupling in the system. This research provides theoretical and practical support for the design and optimization of similar support structures in reservoir bank environments.

PLoS ONEVol. 21(1)
Chongqing University of Science and Technology (CN), Ya'an Polytechnic College (CN), Chongqing Construction Engineering Investment Holding (China) (CN), China Coal Technology and Engineering Group Corp (China) (CN), China Construction Eighth Engineering Division (China) (CN)
Openalex Percentile: Top 99%
Dam Engineering and Safety
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.