A Hybrid FMEA-DEMATEL Approach to Uncover Root Causes of Cost Overruns in Military Construction Projects

Controlling and preventing cost overruns in defense construction projects remains a persistent and high-stakes challenge for construction project managers in defense agencies alike. Given the strategic importance of these projects and the complex web of interrelated risk factors, this study advances beyond conventional approaches by integrating Failure Mode and Effects Analysis (FMEA) with the DEMATEL (Decision-Making Trial and Evaluation Laboratory) method. Initially, 85 distinct cost overrun factors were identified from literature and expert input, each assessed via FMEA to compute a Risk Priority Number (RPN). The top-ranked threats included General Inflation (RPN = 810) and Exchange Rate Volatility (RPN = 729), reflecting their high severity and low detectability. To manage complexity, based experts’ judgment, these factors were systematically consolidated into 18 representative categories spanning external, material, labor, equipment, subcontractor, and financial domains. A DEMATEL analysis was then applied to model causal relationships among these categories. The results reveal that political and bureaucratic interference, owner-side financial instability, and macroeconomic shocks function as the primary root causes, exerting strong net influence on downstream effects such as design changes, material delays, and schedule slippage. In contrast, many commonly managed symptoms (e.g., labor productivity or material theft) are largely consequences of these upstream drivers. This study thus proposes a dual-layer risk response framework: Strategic-level interventions, including inflation-indexed contracts, inter-ministerial coordination, and dedicated defense construction financing and tactical controls targeting high-prominence effects. The findings advocate for a paradigm shift in defense project management: from reactive cost containment to proactive systemic risk governance, where financial and institutional resilience becomes as critical as on-site execution efficiency.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2025-12-31
DOI
https://doi.org/10.5281/zenodo.18109353
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Hybrid FMEA-DEMATEL Approach to Uncover Root Causes of Cost Overruns in Military Construction Projects

Masoud Ghasem Zadeh, Jafar G. Kheljani, Morteza Abbasi
Zenodo (CERN European Organization for Nuclear Research)
Construction Project Management and Performance
article

A Hybrid FMEA-DEMATEL Approach to Uncover Root Causes of Cost Overruns in Military Construction Projects

Masoud Ghasem Zadeh, Jafar G. Kheljani, Morteza Abbasi
article en

Abstract

Controlling and preventing cost overruns in defense construction projects remains a persistent and high-stakes challenge for construction project managers in defense agencies alike. Given the strategic importance of these projects and the complex web of interrelated risk factors, this study advances beyond conventional approaches by integrating Failure Mode and Effects Analysis (FMEA) with the DEMATEL (Decision-Making Trial and Evaluation Laboratory) method. Initially, 85 distinct cost overrun factors were identified from literature and expert input, each assessed via FMEA to compute a Risk Priority Number (RPN). The top-ranked threats included General Inflation (RPN = 810) and Exchange Rate Volatility (RPN = 729), reflecting their high severity and low detectability. To manage complexity, based experts’ judgment, these factors were systematically consolidated into 18 representative categories spanning external, material, labor, equipment, subcontractor, and financial domains. A DEMATEL analysis was then applied to model causal relationships among these categories. The results reveal that political and bureaucratic interference, owner-side financial instability, and macroeconomic shocks function as the primary root causes, exerting strong net influence on downstream effects such as design changes, material delays, and schedule slippage. In contrast, many commonly managed symptoms (e.g., labor productivity or material theft) are largely consequences of these upstream drivers. This study thus proposes a dual-layer risk response framework: Strategic-level interventions, including inflation-indexed contracts, inter-ministerial coordination, and dedicated defense construction financing and tactical controls targeting high-prominence effects. The findings advocate for a paradigm shift in defense project management: from reactive cost containment to proactive systemic risk governance, where financial and institutional resilience becomes as critical as on-site execution efficiency.

Zenodo (CERN European Organization for Nuclear Research)
Decent work and economic growth
Openalex Percentile: Top 26%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.