Price Adjustment Clauses in Highway Construction: State of the Practice

Material price volatility creates uncertainty for highway construction projects. This uncertainty complicates bid preparation because suppliers may be unable to guarantee fixed material prices for the project duration. In response, contractors often include risk premiums, leading to price speculation and inflated bid prices. These embedded contingencies may cause transportation agencies to overpay under fixed-price contracts. To address these risks, state DOTs implement material price adjustment clauses (PACs) in certain highway construction contracts. While PACs are commonly applied to construction materials such as fuel, asphalt, steel, and cement, their implementation varies across several decision factors—including eligible bid items, trigger thresholds, opt-in/opt-out provisions, caps, and more. The growing interest in PACs, along with these variations, underscores the need for a review of current practices to identify the key elements shaping their use. This study reviews PAC implementation across 50 state DOTs, focusing on variations in PAC eligibility requirements, contractual conditions, triggering events, and calculation process. Data were collected from publicly available specifications, verified through direct communication with state DOT construction-related representatives, and analyzed using content analysis. Results show that 96% of state DOTs implement at least one type of material price adjustment (including pilot implementation), with fuel (84%) and asphalt (80%) being the most common, followed by steel (36%) and cement (6%). Most PACs require a 5% trigger value to activate price adjustment and use an indexed material usage per unit method for calculation. These findings offer a national reference point for evaluating the current practices and considering potential improvements to PAC implementation strategies.

Authors

Institutions

Publication Details

Journal
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Published
2025-12-31
DOI
https://doi.org/10.1061/jladah.ladr-1485
Primary Topic
Infrastructure Maintenance and Monitoring
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Price Adjustment Clauses in Highway Construction: State of the Practice

G.M. Geary, Abdolmajid Erfani, Baabak Ashuri, Mohsen Naghdi
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Infrastructure Maintenance and Monitoring
article

Price Adjustment Clauses in Highway Construction: State of the Practice

G.M. Geary, Abdolmajid Erfani, Baabak Ashuri, Mohsen Naghdi
article en

Abstract

Material price volatility creates uncertainty for highway construction projects. This uncertainty complicates bid preparation because suppliers may be unable to guarantee fixed material prices for the project duration. In response, contractors often include risk premiums, leading to price speculation and inflated bid prices. These embedded contingencies may cause transportation agencies to overpay under fixed-price contracts. To address these risks, state DOTs implement material price adjustment clauses (PACs) in certain highway construction contracts. While PACs are commonly applied to construction materials such as fuel, asphalt, steel, and cement, their implementation varies across several decision factors—including eligible bid items, trigger thresholds, opt-in/opt-out provisions, caps, and more. The growing interest in PACs, along with these variations, underscores the need for a review of current practices to identify the key elements shaping their use. This study reviews PAC implementation across 50 state DOTs, focusing on variations in PAC eligibility requirements, contractual conditions, triggering events, and calculation process. Data were collected from publicly available specifications, verified through direct communication with state DOT construction-related representatives, and analyzed using content analysis. Results show that 96% of state DOTs implement at least one type of material price adjustment (including pilot implementation), with fuel (84%) and asphalt (80%) being the most common, followed by steel (36%) and cement (6%). Most PACs require a 5% trigger value to activate price adjustment and use an indexed material usage per unit method for calculation. These findings offer a national reference point for evaluating the current practices and considering potential improvements to PAC implementation strategies.

Journal of Legal Affairs and Dispute Resolution in Engineering and ConstructionVol. 18(2)
Michigan Technological University (US), GfK (United States) (US), Kyung Hee University (KR)
Openalex Percentile: Top 35%
Infrastructure Maintenance and Monitoring
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.