Lean Six Sigma Integration with VALSAT and FMEA Methods for Waste Identification in PT. X

This study identifies and reduces waste in the cooking oil production process at PT X by integrating Lean Six Sigma with Value Stream Analysis Tools (VALSAT) and Failure Mode and Effects Analysis (FMEA). VALSAT is used to classify value-added and non-value-added activities, while FMEA prioritizes waste based on Risk Priority Number (RPN). The results show that defects are the most dominant waste (RPN 294), followed by waiting and inventory. Process mapping reveals a total lead time of 370 minutes, in which 60 minutes are non-value added. Improvement recommendations include scheduling preventive maintenance, aligning raw material orders with actual demand, optimizing operator coordination, applying FIFO in inventory handling, and increasing transportation efficiency. This integrative approach provides a structured method for identifying critical waste sources and supports operational efficiency improvement in food-processing industries.

Authors

Institutions

Publication Details

Journal
Jurnal IPTEK
Published
2025-12-30
DOI
https://doi.org/10.31284/j.iptek.2025.v29i2.7665
Primary Topic
Quality and Supply Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Lean Six Sigma Integration with VALSAT and FMEA Methods for Waste Identification in PT. X

Dedy Kunhadi, Bambang Sutejo, Moh. Ainul Fais
Jurnal IPTEK
Quality and Supply Management
article

Lean Six Sigma Integration with VALSAT and FMEA Methods for Waste Identification in PT. X

Dedy Kunhadi, Bambang Sutejo, Moh. Ainul Fais
article en

Abstract

This study identifies and reduces waste in the cooking oil production process at PT X by integrating Lean Six Sigma with Value Stream Analysis Tools (VALSAT) and Failure Mode and Effects Analysis (FMEA). VALSAT is used to classify value-added and non-value-added activities, while FMEA prioritizes waste based on Risk Priority Number (RPN). The results show that defects are the most dominant waste (RPN 294), followed by waiting and inventory. Process mapping reveals a total lead time of 370 minutes, in which 60 minutes are non-value added. Improvement recommendations include scheduling preventive maintenance, aligning raw material orders with actual demand, optimizing operator coordination, applying FIFO in inventory handling, and increasing transportation efficiency. This integrative approach provides a structured method for identifying critical waste sources and supports operational efficiency improvement in food-processing industries.

Jurnal IPTEKVol. 29(2)
Universitas WR Supratman (ID)
Responsible consumption and production
Openalex Percentile: Top 24%
Quality and Supply Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Lean Six Sigma Integration with VALSAT and FMEA Methods for Waste Identification in PT. X — Dedy Kunhadi, Bambang Sutejo, et al. · Jurnal IPTEK (2025) | TGRS Research Map | TGRS