Predictive-comparative framework for construction cost control using long short-term memory and digital twin technologies

Fragmented project records and delayed validation hinder proactive cost control in construction. Yet current research offers limited guidance on converting inconsistent, lagged evidence into timely and auditable control signals, which can delay or complicate corrective action in practice. This paper develops a predictive-comparative framework integrating long short-term memory (LSTM) cost forecasting with digital twin (DT) progress verification for early cost governance. A sequence-to-sequence LSTM generates probabilistic cumulative cost trajectories, while the DT workflow reconstructs verified progress from digital models and translates it into cost-weighted earned value. Forecast, verified, and baseline curves are aligned on a monthly scale, and tolerance-based deviation filtering suppresses transient noise and flags sustained divergence. Synthetic experiments and a 24-month case study show strong alignment with realised cumulative costs and timely identification of sustained divergence. The framework provides a practical basis for cost governance and is extensible to live DT data streams and adaptive thresholds.

Authors

Institutions

Publication Details

Journal
Automation in Construction
Published
2026-08-27
DOI
https://doi.org/10.1016/j.autcon.2026.107229
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Predictive-comparative framework for construction cost control using long short-term memory and digital twin technologies

YUXING WU, Samuel Frimpong
Automation in Construction
BIM and Construction Integration
article

Predictive-comparative framework for construction cost control using long short-term memory and digital twin technologies

YUXING WU, Samuel Frimpong
article en

Abstract

Fragmented project records and delayed validation hinder proactive cost control in construction. Yet current research offers limited guidance on converting inconsistent, lagged evidence into timely and auditable control signals, which can delay or complicate corrective action in practice. This paper develops a predictive-comparative framework integrating long short-term memory (LSTM) cost forecasting with digital twin (DT) progress verification for early cost governance. A sequence-to-sequence LSTM generates probabilistic cumulative cost trajectories, while the DT workflow reconstructs verified progress from digital models and translates it into cost-weighted earned value. Forecast, verified, and baseline curves are aligned on a monthly scale, and tolerance-based deviation filtering suppresses transient noise and flags sustained divergence. Synthetic experiments and a 24-month case study show strong alignment with realised cumulative costs and timely identification of sustained divergence. The framework provides a practical basis for cost governance and is extensible to live DT data streams and adaptive thresholds.

Automation in ConstructionVol. 192
University of South Australia (AU), UNSW Sydney (AU)
Openalex Percentile: Top 99%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.