This study aims to evaluate the environmental and spatial suitability of the planned Giperborey 50 MW wind power plant near Osakarovka in the Karaganda Region of Kazakhstan and to determine whether the site meets technical, ecological and socio-economic requirements for development. The appraisal combined site observations; analysis of climatic records from the nearest Kazhydromet station to characterise wind resource and seasonal extremes; field noise measurements with a class-1 sound level meter and sound-propagation modelling in WindPro; avifaunal monitoring during the autumn migration period and a first-stage Scottish Natural Heritage collision-risk calculation with seasonal adjustment; vegetation and soil transects; line-of-sight and photographic documentation of visual exposure; and an assessment of land use, access routes and proximity to the electrical grid. Instruments were field-calibrated before and after measurements, and visual checks used representative viewpoints at standard observer height. Avian surveys covered peak dawn and dusk period s within defined migration windows. Results indicate favourable wind conditions, with an annual mean speed above approximately 4.7 m/s and limited calm periods; gently undulating steppe on predominantly low-value grazing land; and the absence of critical habitats within the project footprint. Modelled operational noise remains ≤ 55 dB at the nearest residential receptors, and th e 40 dB contour does not extend beyond the project boundary. Compliance held under downwind and neutral stability assumptions applied in the model. Migration counts recorded low use of the rotor-swept zone by high-risk species, and predicted collision totals fall below commonly applied screening thresholds. Visual checks show limited exposure of nearby settlements, and access logistics are feasible via existing roads with minor upgrades. Public interviews indicated neutral-topositive attitudes associated with expectations of local employment and infrastructure improvement. Overall, under the assessed conditions, the site satisfies the study criteria for environmentally compatible development.

Authors

Publication Details

Journal
GeoJournal of Tourism and Geosites
Published
2025-12-31
DOI
https://doi.org/10.30892/gtg.634spl30-1645
Primary Topic
Noise Effects and Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

SUSTAINABLE SITING OF WIND FARMS IN KAZAKHSTAN: A CASE STUDY OF THE KARAGANDA REGION

Merey MURSAL, Makpal ZHUNUSSOVA, Zhandos MUKAYEV, Aizhan MUSSAGALIYEVA
GeoJournal of Tourism and Geosites
Noise Effects and Management
article

SUSTAINABLE SITING OF WIND FARMS IN KAZAKHSTAN: A CASE STUDY OF THE KARAGANDA REGION

Merey MURSAL, Makpal ZHUNUSSOVA, Zhandos MUKAYEV, Aizhan MUSSAGALIYEVA
article en

Abstract

This study aims to evaluate the environmental and spatial suitability of the planned Giperborey 50 MW wind power plant near Osakarovka in the Karaganda Region of Kazakhstan and to determine whether the site meets technical, ecological and socio-economic requirements for development. The appraisal combined site observations; analysis of climatic records from the nearest Kazhydromet station to characterise wind resource and seasonal extremes; field noise measurements with a class-1 sound level meter and sound-propagation modelling in WindPro; avifaunal monitoring during the autumn migration period and a first-stage Scottish Natural Heritage collision-risk calculation with seasonal adjustment; vegetation and soil transects; line-of-sight and photographic documentation of visual exposure; and an assessment of land use, access routes and proximity to the electrical grid. Instruments were field-calibrated before and after measurements, and visual checks used representative viewpoints at standard observer height. Avian surveys covered peak dawn and dusk period s within defined migration windows. Results indicate favourable wind conditions, with an annual mean speed above approximately 4.7 m/s and limited calm periods; gently undulating steppe on predominantly low-value grazing land; and the absence of critical habitats within the project footprint. Modelled operational noise remains ≤ 55 dB at the nearest residential receptors, and th e 40 dB contour does not extend beyond the project boundary. Compliance held under downwind and neutral stability assumptions applied in the model. Migration counts recorded low use of the rotor-swept zone by high-risk species, and predicted collision totals fall below commonly applied screening thresholds. Visual checks show limited exposure of nearby settlements, and access logistics are feasible via existing roads with minor upgrades. Public interviews indicated neutral-topositive attitudes associated with expectations of local employment and infrastructure improvement. Overall, under the assessed conditions, the site satisfies the study criteria for environmentally compatible development.

GeoJournal of Tourism and GeositesVol. 63(4 supplement)
Industry, innovation and infrastructure
Openalex Percentile: Top 22%
Noise Effects and Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

SUSTAINABLE SITING OF WIND FARMS IN KAZAKHSTAN: A CASE STUDY OF THE KARAGANDA REGION — Merey MURSAL, Makpal ZHUNUSSOVA, et al. · GeoJournal of Tourism and Geosites (2025) | TGRS Research Map | TGRS