DETERMINATION OF FACTORS AFFECTING PROGRAM SETUP TIMES IN PRODUCTION PLANNING USING MACHINE LEARNING METHODS

In this study, production-related data obtained from the corporate ERP/MES infrastructure (e.g., SAP) of an industrial fastener manufacturing facility operating in İzmir, Turkey, covering the years 2014–2025, were utilized to identify the factors influencing program setup time and to develop a predictive model to support production planning decisions. Program setup time is defined as the duration between the completion of production for the previous part and the point at which the machine becomes ready to resume mass production with the next part. Both statistical methods and machine learning models were employed for this purpose. The dataset used in the study belongs to four press machines of the same model, selected to provide a homogeneous analysis environment due to their processing of similar and identical product groups. Following data preprocessing, descriptive statistics, correlation analyses, regression models, and machine learning approaches (Linear Regression, Random Forest, XGBoost, and Artificial Neural Networks) were applied. Comparison metrics indicated that the Random Forest model achieved the highest predictive performance, followed by XGBoost. In contrast, the lower performance of the linear regression model was attributed to its limited ability to capture nonlinear and interaction-based relationships among variables. The results revealed that variables such as metric change between the previous and the new product, piercing pin diameter difference, transitions in product types, time elapsed since the last production, raw material/diameter relationship, and operator competency exhibited statistically significant effects on program setup time.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2025-12-30
DOI
https://doi.org/10.5281/zenodo.18099096
Primary Topic
ERP Systems Implementation and Impact
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

DETERMINATION OF FACTORS AFFECTING PROGRAM SETUP TIMES IN PRODUCTION PLANNING USING MACHINE LEARNING METHODS

Adem Kuş, ÖZGÜL ÇİLENGİROĞLU VUPA
Zenodo (CERN European Organization for Nuclear Research)
ERP Systems Implementation and Impact
article

DETERMINATION OF FACTORS AFFECTING PROGRAM SETUP TIMES IN PRODUCTION PLANNING USING MACHINE LEARNING METHODS

Adem Kuş, ÖZGÜL ÇİLENGİROĞLU VUPA
article en

Abstract

In this study, production-related data obtained from the corporate ERP/MES infrastructure (e.g., SAP) of an industrial fastener manufacturing facility operating in İzmir, Turkey, covering the years 2014–2025, were utilized to identify the factors influencing program setup time and to develop a predictive model to support production planning decisions. Program setup time is defined as the duration between the completion of production for the previous part and the point at which the machine becomes ready to resume mass production with the next part. Both statistical methods and machine learning models were employed for this purpose. The dataset used in the study belongs to four press machines of the same model, selected to provide a homogeneous analysis environment due to their processing of similar and identical product groups. Following data preprocessing, descriptive statistics, correlation analyses, regression models, and machine learning approaches (Linear Regression, Random Forest, XGBoost, and Artificial Neural Networks) were applied. Comparison metrics indicated that the Random Forest model achieved the highest predictive performance, followed by XGBoost. In contrast, the lower performance of the linear regression model was attributed to its limited ability to capture nonlinear and interaction-based relationships among variables. The results revealed that variables such as metric change between the previous and the new product, piercing pin diameter difference, transitions in product types, time elapsed since the last production, raw material/diameter relationship, and operator competency exhibited statistically significant effects on program setup time.

Zenodo (CERN European Organization for Nuclear Research)
Industry, innovation and infrastructure
Openalex Percentile: Top 24%
ERP Systems Implementation and Impact
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

DETERMINATION OF FACTORS AFFECTING PROGRAM SETUP TIMES IN PRODUCTION PLANNING USING MACHINE LEARNING METHODS — Adem Kuş, ÖZGÜL ÇİLENGİROĞLU VUPA · Zenodo (CERN European Organization for Nuclear Research) (2025) | TGRS Research Map | TGRS