Is a Capacity Remuneration Mechanism Worth the Cost? A Case Study of Finland

This case study analyzes the costs and profitability of a capacity remuneration mechanism in Finland. The capacity remuneration mechanism provides an annual capacity payment to owners for maintaining sufficient capacity to address scarcity events. Two approaches are used: a linear model, linking the annual payment to electricity prices, and a stochastic model, incorporating uncertainties via Monte Carlo simulation. The capacity payments are approximately €68000/MW/year for a gas turbine, and €110000/MW/year for a CCGT regardless of the model used. Considering the total capacity required to cover all scarcity events in Finland, the annual cost is estimated at €51–150 million for a gas turbine, and €73–261 million for a CCGT, corresponding to an additional electricity cost of €0.62– 3.19 per each MWh consumed in Finland. By comparison, the annual value of lost load is clearly lower, at around €31.6 million per year.

Authors

Institutions

Publication Details

Published
2025-10-20
DOI
https://doi.org/10.1109/isgteurope64741.2025.11305613
Primary Topic
Electric Power System Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Is a Capacity Remuneration Mechanism Worth the Cost? A Case Study of Finland

Samuli Honkapuro, Jasmin Salmi
Electric Power System Optimization
article

Is a Capacity Remuneration Mechanism Worth the Cost? A Case Study of Finland

Samuli Honkapuro, Jasmin Salmi
article en

Abstract

This case study analyzes the costs and profitability of a capacity remuneration mechanism in Finland. The capacity remuneration mechanism provides an annual capacity payment to owners for maintaining sufficient capacity to address scarcity events. Two approaches are used: a linear model, linking the annual payment to electricity prices, and a stochastic model, incorporating uncertainties via Monte Carlo simulation. The capacity payments are approximately €68000/MW/year for a gas turbine, and €110000/MW/year for a CCGT regardless of the model used. Considering the total capacity required to cover all scarcity events in Finland, the annual cost is estimated at €51–150 million for a gas turbine, and €73–261 million for a CCGT, corresponding to an additional electricity cost of €0.62– 3.19 per each MWh consumed in Finland. By comparison, the annual value of lost load is clearly lower, at around €31.6 million per year.

Lappeenranta-Lahti University of Technology (FI)
Affordable and clean energy
Openalex Percentile: Top 41%
Electric Power System Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.