A Monte Carlo Tree Search with Reinforcement Learning and Graph Relational Attention Network for Dynamic Flexible Job Shop Scheduling Problem

The dynamic flexible job shop scheduling problem (DFJSP) with machine faults, considering the recovery condition and variable processing time, is studied to determine the rescheduling scheme when machine faults occur in real time. The Monte Carlo Tree Search (MCTS) algorithm with reinforcement learning and the relational-enhanced graph attention network (MGRL) is presented to address the DFJSP with machine faults, considering the recovery condition and variable processing time. The MCTS with the skip-node restart strategy, which utilizes local optimal solutions found during the Monte Carlo sampling process, is designed to enhance the optimization efficiency of MCTS in real time. A relational graph attention network (RGAT), a relational-enhanced and transformer-integrated graph network in the MGRL, is designed to analyze the scheduling disjunctive graph, guide the Monte Carlo sampling method to improve sampling efficiency, and enhance the quality of MCTS optimization decisions. Experimental results demonstrate the effectiveness of the RGAT and the skip-node restart strategy. Further application analysis results show that the MGRL is optimal among all comparison methods when algorithms solve the DFJSP.

Authors

Institutions

Publication Details

Journal
Big Data and Cognitive Computing
Published
2025-12-26
DOI
https://doi.org/10.3390/bdcc10010009
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Monte Carlo Tree Search with Reinforcement Learning and Graph Relational Attention Network for Dynamic Flexible Job Shop Scheduling Problem

Rui Yang, Jia Yu, Qiuyu Zhang
Big Data and Cognitive Computing
Scheduling and Optimization Algorithms
article

A Monte Carlo Tree Search with Reinforcement Learning and Graph Relational Attention Network for Dynamic Flexible Job Shop Scheduling Problem

Rui Yang, Jia Yu, Qiuyu Zhang
article en

Abstract

The dynamic flexible job shop scheduling problem (DFJSP) with machine faults, considering the recovery condition and variable processing time, is studied to determine the rescheduling scheme when machine faults occur in real time. The Monte Carlo Tree Search (MCTS) algorithm with reinforcement learning and the relational-enhanced graph attention network (MGRL) is presented to address the DFJSP with machine faults, considering the recovery condition and variable processing time. The MCTS with the skip-node restart strategy, which utilizes local optimal solutions found during the Monte Carlo sampling process, is designed to enhance the optimization efficiency of MCTS in real time. A relational graph attention network (RGAT), a relational-enhanced and transformer-integrated graph network in the MGRL, is designed to analyze the scheduling disjunctive graph, guide the Monte Carlo sampling method to improve sampling efficiency, and enhance the quality of MCTS optimization decisions. Experimental results demonstrate the effectiveness of the RGAT and the skip-node restart strategy. Further application analysis results show that the MGRL is optimal among all comparison methods when algorithms solve the DFJSP.

Big Data and Cognitive ComputingVol. 10(1)
Lanzhou University of Technology (CN)
Decent work and economic growth
Openalex Percentile: Top 33%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

A Monte Carlo Tree Search with Reinforcement Learning and Graph Relational Attention Network for Dynamic Flexible Job Shop Scheduling Problem — Rui Yang, Jia Yu, et al. · Big Data and Cognitive Computing (2025) | TGRS Research Map | TGRS