An integrated analytics approach to multi-project scheduling and material procurement with coordinated hub location
This study presents an integrated framework combining multi-project scheduling, material procurement, and the hub location problem to simultaneously minimize project completion times and overall project and logistics costs. To address the challenge of allocating high-cost renewable resources, we incorporate rental options that balance the trade-off between additional rental expenses and potential project delays. A multi-objective optimization model is developed, integrating the scheduling of multiple projects with coordinated material procurement. To reduce logistics costs and improve delivery efficiency, consolidation hubs are introduced where materials from various suppliers are aggregated before being dispatched to project sites. The model considers the availability of renewable rental resources and storage space capacity while scheduling project activities. Due to the problem's computational complexity, two metaheuristic algorithms NSGA-II (Non-dominated Sorting Genetic Algorithm II) and MOSFS (Multi-objective Stochastic Fractal Search) are employed to obtain near-optimal solutions for large-scale scenarios. The proposed approach is validated through a real-world case study involving a bridge construction project and various benchmark instances of different sizes. Results indicate that while NSGA-II performs better on one performance metric, MOSFS consistently outperforms NSGA-II across most criteria, particularly in large-scale problems. The main contributions of this research include integrating project scheduling, material procurement, and hub location within a single unified framework. The model also incorporates renewable rental resources and realistic, type-specific storage capacity constraints that directly affect material flow and the initiation of project activities. • Present an integrated model for synchronizing project scheduling, procurement, and hub location. • Introduce rental resources and storage limits to enhance realism in scheduling decisions. • Compare two metaheuristic algorithms to solve complex supply chain optimization problems. • Validate the proposed model through a real-world infrastructure project and benchmark scenarios. • Analyze sensitivity to resource lead times, hub capacities, and storage constraints.
Authors
- Mohammad Khalilzadeh (ORCID: https://orcid.org/0000-0002-2373-8505)
- Sasan Mazaheri (ORCID: https://orcid.org/0000-0003-4469-6612)
- Mahsa Ahmadi
- Ali Heidari
- Mohammad Hakimi Asiabar
Institutions
- University of Iowa (US)
- Iowa State University (US)
- University of Tehran (IR)
- Shahid Beheshti University (IR)
- Pontificia Universidad Católica del Perú (PE)
- Iran University of Science and Technology (IR)
Publication Details
- Journal
- Supply Chain Analytics
- Published
- 2025-12-27
- DOI
- https://doi.org/10.1016/j.sca.2025.100191
- Primary Topic
- Resource-Constrained Project Scheduling
- Type
- article
- Field-Weighted Citation Impact
- 0.00