Streamlining Resolution Processes in Public Project Disputes

This paper addresses the pressing issue of resolving contractual disputes in public construction projects, emphasizing the need to understand these challenges and implement effective resolution strategies in Malaysian public works. A comprehensive literature review identifies key barriers to implementing first-tier dispute resolution mechanisms, particularly within the Malaysian Public Works Department (PWD). Concerns related to impartiality, professional competence, and the adoption of alternative dispute resolution (ADR) methods are examined, along with opportunities for amicable settlements through negotiation, mediation, and the Dispute Resolution Committee (DRC). The study applies qualitative research methods, including purposive sampling, semistructured interviews, and adherence to ethical research protocols. Key challenges in the effectiveness of first-tier dispute resolution under PWD contracts include impartiality concerns, limited legal and contractual knowledge, difficulties in timely decision-making by the officer empowered (OE) within the required 45-day period, and administrative inefficiencies. Negotiation is found to be the most suitable method for early dispute resolution, whereas mediation and DRC are less effective. The proposed framework recommends revisions to PWD procedures to better align with arbitration principles, clearer guidelines to uphold natural justice, the establishment of specialized support committees for the OE, and enhancements to the negotiation process to support informed and timely decision-making.

Authors

Institutions

Publication Details

Journal
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Published
2025-12-27
DOI
https://doi.org/10.1061/jladah.ladr-1345
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Streamlining Resolution Processes in Public Project Disputes

Nur Emma Mustaffa, Rozilah Talib, Syed Saiful Nizam Syed Mubarat
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Construction Project Management and Performance
article

Streamlining Resolution Processes in Public Project Disputes

Nur Emma Mustaffa, Rozilah Talib, Syed Saiful Nizam Syed Mubarat
article en

Abstract

This paper addresses the pressing issue of resolving contractual disputes in public construction projects, emphasizing the need to understand these challenges and implement effective resolution strategies in Malaysian public works. A comprehensive literature review identifies key barriers to implementing first-tier dispute resolution mechanisms, particularly within the Malaysian Public Works Department (PWD). Concerns related to impartiality, professional competence, and the adoption of alternative dispute resolution (ADR) methods are examined, along with opportunities for amicable settlements through negotiation, mediation, and the Dispute Resolution Committee (DRC). The study applies qualitative research methods, including purposive sampling, semistructured interviews, and adherence to ethical research protocols. Key challenges in the effectiveness of first-tier dispute resolution under PWD contracts include impartiality concerns, limited legal and contractual knowledge, difficulties in timely decision-making by the officer empowered (OE) within the required 45-day period, and administrative inefficiencies. Negotiation is found to be the most suitable method for early dispute resolution, whereas mediation and DRC are less effective. The proposed framework recommends revisions to PWD procedures to better align with arbitration principles, clearer guidelines to uphold natural justice, the establishment of specialized support committees for the OE, and enhancements to the negotiation process to support informed and timely decision-making.

Journal of Legal Affairs and Dispute Resolution in Engineering and ConstructionVol. 18(2)
Tunku Abdul Rahman University of Management and Technology (MY), Universiti Tunku Abdul Rahman (MY)
Peace, Justice and strong institutions
Openalex Percentile: Top 28%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.