Multi-Stage Robust Optimization of a Wastewater Treatment Biogas Generator Participating in Day-Ahead and Real-Time Regulation Markets

Wastewater treatment plants are large, energy-intensive loads that can be optimally controlled to support grid reliability and reduce operational costs. This paper presents a multi-stage robust optimization framework to control a wastewater treatment plant equipped with a biogas generator and storage tank for participation in California’s day-ahead and real-time frequency regulation markets while managing biogas production and regulation signal uncertainty. We solve for day-ahead regulation capacity in the first stage and real-time regulation capacity over the day as the uncertainty is progressively revealed. We propose affine control policies to determine the real-time regulation capacity based on partial uncertainty realizations. This results in a tractable affinely adjustable robust counterpart. In a case study, we evaluate our proposed approach against a day-ahead-only robust formulation and found that our approach increases regulation capacity provision and lowers operational costs.

Authors

Publication Details

Journal
ScholarSpace (University of Hawaii at Manoa)
Published
2025-12-23
Primary Topic
Frequency Control in Power Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Multi-Stage Robust Optimization of a Wastewater Treatment Biogas Generator Participating in Day-Ahead and Real-Time Regulation Markets

Anna Stuhlmacher, Alyssa Kody
ScholarSpace (University of Hawaii at Manoa)
Frequency Control in Power Systems
article

Multi-Stage Robust Optimization of a Wastewater Treatment Biogas Generator Participating in Day-Ahead and Real-Time Regulation Markets

Anna Stuhlmacher, Alyssa Kody
article en

Abstract

Wastewater treatment plants are large, energy-intensive loads that can be optimally controlled to support grid reliability and reduce operational costs. This paper presents a multi-stage robust optimization framework to control a wastewater treatment plant equipped with a biogas generator and storage tank for participation in California’s day-ahead and real-time frequency regulation markets while managing biogas production and regulation signal uncertainty. We solve for day-ahead regulation capacity in the first stage and real-time regulation capacity over the day as the uncertainty is progressively revealed. We propose affine control policies to determine the real-time regulation capacity based on partial uncertainty realizations. This results in a tractable affinely adjustable robust counterpart. In a case study, we evaluate our proposed approach against a day-ahead-only robust formulation and found that our approach increases regulation capacity provision and lowers operational costs.

ScholarSpace (University of Hawaii at Manoa)
Clean water and sanitation
Openalex Percentile: Top 42%
Frequency Control in Power Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.