Semiautomated Delay Analysis Method Selection for Construction Projects: A Rule-Based Approach

Given the availability of various delay analysis methods, each yielding different results, the proper selection of an appropriate methodology is of paramount importance. Despite the necessity for automation to resolve delay conflicts, the current literature lacks an automated approach to assist contractors and project owners in reaching a consensus on selecting the most suitable delay analysis method without requiring a third party. Hence, to bridge the gap between theoretical research and practical application in achieving an automated delay analysis method, a novel rule-based expert system has been proposed. A structured, multiphase methodology that includes a review of existing methods, identification of key facts, determination of facts and expert rules, development of a forward chaining inference engine, and validation stages is used. Five real-world case examples and the decisions of experts for 15 hypothetical case examples are used for validation. The case examples demonstrate that the system can successfully automate the selection of the most appropriate delay analysis method and support a transparent, systematic approach to managing delays in construction projects. Furthermore, the system can foster consensus among project stakeholders during the selection of a delay analysis method and has the potential to contribute to the resolution of delay disputes.

Authors

Institutions

Publication Details

Journal
Journal of Management in Engineering
Published
2025-12-26
DOI
https://doi.org/10.1061/jmenea.meeng-7064
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Semiautomated Delay Analysis Method Selection for Construction Projects: A Rule-Based Approach

Saman Aminbakhsh, Rifat Sönmez, Mehmet Agar
Journal of Management in Engineering
Construction Project Management and Performance
article

Semiautomated Delay Analysis Method Selection for Construction Projects: A Rule-Based Approach

Saman Aminbakhsh, Rifat Sönmez, Mehmet Agar
article en

Abstract

Given the availability of various delay analysis methods, each yielding different results, the proper selection of an appropriate methodology is of paramount importance. Despite the necessity for automation to resolve delay conflicts, the current literature lacks an automated approach to assist contractors and project owners in reaching a consensus on selecting the most suitable delay analysis method without requiring a third party. Hence, to bridge the gap between theoretical research and practical application in achieving an automated delay analysis method, a novel rule-based expert system has been proposed. A structured, multiphase methodology that includes a review of existing methods, identification of key facts, determination of facts and expert rules, development of a forward chaining inference engine, and validation stages is used. Five real-world case examples and the decisions of experts for 15 hypothetical case examples are used for validation. The case examples demonstrate that the system can successfully automate the selection of the most appropriate delay analysis method and support a transparent, systematic approach to managing delays in construction projects. Furthermore, the system can foster consensus among project stakeholders during the selection of a delay analysis method and has the potential to contribute to the resolution of delay disputes.

Journal of Management in EngineeringVol. 42(2)
Middle East Technical University (TR), Turkish Aerospace Industries (Turkey) (TR), Atilim University (TR)
Openalex Percentile: Top 28%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.