Seamless Short‐ to Mid‐Term Probabilistic Wind Power Forecasting

ABSTRACT This paper brings a new understanding to the relative importance of different uncertainty sources across forecast horizons up to 7 days ahead. It presents a method for probabilistic wind power forecasting that quantifies uncertainty from weather forecasts and weather‐to‐power conversion separately. The study reveals that weather‐to‐power uncertainty is more significant for short‐term forecasts, while weather forecast uncertainty dominates mid‐term forecasts, with the transition point varying between wind farms. Offshore farms typically see this shift at shorter lead times than onshore. By addressing both uncertainty sources, the proposed forecast method achieves state‐of‐the‐art results for lead times of 6 to 162 h, eliminating the need for separate models for short‐ and mid‐term forecasting. Importantly, it also significantly improves short‐term forecasts during high weather uncertainty periods, where methods based on deterministic weather forecasts dramatically underestimate total uncertainty. The findings are supported by an extensive, reproducible case study comprising 73 wind farms in Great Britain over 5 years.

Institutions

Publication Details

Journal
Wind Energy
Published
2025-12-25
DOI
https://doi.org/10.1002/we.70079
Citations
1
Primary Topic
Energy Load and Power Forecasting
Type
article
Field-Weighted Citation Impact
0.73

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Seamless Short‐ to Mid‐Term Probabilistic Wind Power Forecasting

1 citations
Wind Energy
Energy Load and Power Forecasting
0.73
article

Seamless Short‐ to Mid‐Term Probabilistic Wind Power Forecasting

article en
1 citations

Abstract

ABSTRACT This paper brings a new understanding to the relative importance of different uncertainty sources across forecast horizons up to 7 days ahead. It presents a method for probabilistic wind power forecasting that quantifies uncertainty from weather forecasts and weather‐to‐power conversion separately. The study reveals that weather‐to‐power uncertainty is more significant for short‐term forecasts, while weather forecast uncertainty dominates mid‐term forecasts, with the transition point varying between wind farms. Offshore farms typically see this shift at shorter lead times than onshore. By addressing both uncertainty sources, the proposed forecast method achieves state‐of‐the‐art results for lead times of 6 to 162 h, eliminating the need for separate models for short‐ and mid‐term forecasting. Importantly, it also significantly improves short‐term forecasts during high weather uncertainty periods, where methods based on deterministic weather forecasts dramatically underestimate total uncertainty. The findings are supported by an extensive, reproducible case study comprising 73 wind farms in Great Britain over 5 years.

Wind EnergyVol. 29(2)
University of Glasgow (GB)
University of Glasgow
Affordable and clean energy
Openalex Percentile: Top 20%
Energy Load and Power Forecasting
0.73
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Seamless Short‐ to Mid‐Term Probabilistic Wind Power Forecasting · Wind Energy (2025) | TGRS Research Map | TGRS