From Positions to Interests:Strategic Negotiation in a Soy Processing Plant Project

This article presents a descriptive case study of a negotiation surrounding the construction of a soybean crushing plant in Mato Grosso do Sul, center western Brazil. The engineering firm neededto handle an intricate communication process with their international contractor who operated through a joint venture that used a package segregation approach for electrical and mechanical and structural work. The company started with a complete electrical project which included design work and material supply and panel installation and labor costs and automation systems but the following discussions brought the project down to basic labor work while the client wanted to buy all materials from foreign suppliers. The transition brought essential problems which included following regulations and obtaining technical approval and dealing with supply chain disruptions and delivery complexities. The company took two steps to solve the problem through customer disclosure of hidden costs and creating new solutions which united process integration with risk management to deliver the highest possible value. The negotiation remains unresolved because it is unknown whether financial limitations or joint solutions will determine the final outcome.

Authors

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2025-12-24
DOI
https://doi.org/10.5281/zenodo.18045922
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

From Positions to Interests:Strategic Negotiation in a Soy Processing Plant Project

MURILLO DE OLIVEIRA DIAS, Diego Ramos Biondo
Zenodo (CERN European Organization for Nuclear Research)
Construction Project Management and Performance
article

From Positions to Interests:Strategic Negotiation in a Soy Processing Plant Project

MURILLO DE OLIVEIRA DIAS, Diego Ramos Biondo
article en

Abstract

This article presents a descriptive case study of a negotiation surrounding the construction of a soybean crushing plant in Mato Grosso do Sul, center western Brazil. The engineering firm neededto handle an intricate communication process with their international contractor who operated through a joint venture that used a package segregation approach for electrical and mechanical and structural work. The company started with a complete electrical project which included design work and material supply and panel installation and labor costs and automation systems but the following discussions brought the project down to basic labor work while the client wanted to buy all materials from foreign suppliers. The transition brought essential problems which included following regulations and obtaining technical approval and dealing with supply chain disruptions and delivery complexities. The company took two steps to solve the problem through customer disclosure of hidden costs and creating new solutions which united process integration with risk management to deliver the highest possible value. The negotiation remains unresolved because it is unknown whether financial limitations or joint solutions will determine the final outcome.

Zenodo (CERN European Organization for Nuclear Research)
Fundação Getulio Vargas (BR)
Decent work and economic growth
Openalex Percentile: Top 29%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

From Positions to Interests:Strategic Negotiation in a Soy Processing Plant Project — MURILLO DE OLIVEIRA DIAS, Diego Ramos Biondo · Zenodo (CERN European Organization for Nuclear Research) (2025) | TGRS Research Map | TGRS