Identify and Ranking Cost Overrun Factors in Military Construction Projects using FMEA

ABSTRACT: Controlling and preventing cost overruns in defense construction projects remain a core, ongoing challenge for project managers. Due to the strategic significance of these endeavors and the numerous factors that drive cost increases in construction, extensive research has been conducted on this subject. Literature review indicates that the identification of cost overrun factors often relies solely on literature review and expert interviews. This research utilizes the Failure Mode and Effects Analysis (FMEA) technique, treating the identified causes of cost overrun as potential failure events. The identified factors are subsequently ranked using the Risk Priority Number (RPN) index. Finally, these factors are categorized, and corresponding risk response scenarios are proposed for their prevention or control. The resulting ranking clearly indicates that external macroeconomic shocks, specifically General Inflation (RPN=810) and Currency Exchange Volatility (RPN=729), represent the most significant threats due to their high inherent severity and difficulty of detection. This research thus provides a prioritized framework, demonstrating that effective cost management in this sector requires a strategic shift toward contractual and financial engineering to buffer against systemic instability, rather than focusing solely on internal project execution efficiencies.

Authors

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2025-12-23
DOI
https://doi.org/10.5281/zenodo.18029143
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Identify and Ranking Cost Overrun Factors in Military Construction Projects using FMEA

Masoud Ghasem Zadeh, Jafar G. Kheljani, Morteza Abbasi
Zenodo (CERN European Organization for Nuclear Research)
Construction Project Management and Performance
article

Identify and Ranking Cost Overrun Factors in Military Construction Projects using FMEA

Masoud Ghasem Zadeh, Jafar G. Kheljani, Morteza Abbasi
article en

Abstract

ABSTRACT: Controlling and preventing cost overruns in defense construction projects remain a core, ongoing challenge for project managers. Due to the strategic significance of these endeavors and the numerous factors that drive cost increases in construction, extensive research has been conducted on this subject. Literature review indicates that the identification of cost overrun factors often relies solely on literature review and expert interviews. This research utilizes the Failure Mode and Effects Analysis (FMEA) technique, treating the identified causes of cost overrun as potential failure events. The identified factors are subsequently ranked using the Risk Priority Number (RPN) index. Finally, these factors are categorized, and corresponding risk response scenarios are proposed for their prevention or control. The resulting ranking clearly indicates that external macroeconomic shocks, specifically General Inflation (RPN=810) and Currency Exchange Volatility (RPN=729), represent the most significant threats due to their high inherent severity and difficulty of detection. This research thus provides a prioritized framework, demonstrating that effective cost management in this sector requires a strategic shift toward contractual and financial engineering to buffer against systemic instability, rather than focusing solely on internal project execution efficiencies.

Zenodo (CERN European Organization for Nuclear Research)
Malek Ashtar University of Technology (IR)
Openalex Percentile: Top 29%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Identify and Ranking Cost Overrun Factors in Military Construction Projects using FMEA — Masoud Ghasem Zadeh, Jafar G. Kheljani, et al. · Zenodo (CERN European Organization for Nuclear Research) (2025) | TGRS Research Map | TGRS