Causal Reasoning in Construction Process Scheduling

This paper introduces an advanced framework for modeling and scheduling construction processes using causal inference techniques, with particular emphasis on capturing complex technological and organizational interdependencies. By integrating causal calculus and counterfactual reasoning, the study demonstrates how construction schedules can be analyzed and optimized not only through temporal relationships but also through explicit cause–effect structures. A matrix-based scheduling methodology is presented, incorporating diagonal and reverse-diagonal time couplings consistent with the Time Coupling Method (TCM). The computational procedure is detailed, including the determination of earliest and latest event times, identification of the critical path, and computation of activity floats. Based on an in-depth examination of technological and organizational constraints, eight theorems are formulated and proven, establishing the fundamental properties of a scheduling approach that embeds causal mechanisms. The findings indicate that the integration of causal inference into construction planning enables more accurate identification of factors influencing project duration, enhances synchronization of dependent activities, and minimizes conflicts and idle times. This causally informed framework strengthens decision-making by allowing practitioners to predict the consequences of modifications in project execution strategies. The developed models constitute a robust foundation for future research on leveraging causal inference algorithms and artificial intelligence to advance construction process management.

Authors

Institutions

Publication Details

Journal
Applied Sciences
Published
2025-12-24
DOI
https://doi.org/10.3390/app16010207
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Causal Reasoning in Construction Process Scheduling

Paulina Kostrzewa-Demczuk, Zdzisław Hejducki, Magdalena Rogalska
Applied Sciences
Resource-Constrained Project Scheduling
article

Causal Reasoning in Construction Process Scheduling

Paulina Kostrzewa-Demczuk, Zdzisław Hejducki, Magdalena Rogalska
article en

Abstract

This paper introduces an advanced framework for modeling and scheduling construction processes using causal inference techniques, with particular emphasis on capturing complex technological and organizational interdependencies. By integrating causal calculus and counterfactual reasoning, the study demonstrates how construction schedules can be analyzed and optimized not only through temporal relationships but also through explicit cause–effect structures. A matrix-based scheduling methodology is presented, incorporating diagonal and reverse-diagonal time couplings consistent with the Time Coupling Method (TCM). The computational procedure is detailed, including the determination of earliest and latest event times, identification of the critical path, and computation of activity floats. Based on an in-depth examination of technological and organizational constraints, eight theorems are formulated and proven, establishing the fundamental properties of a scheduling approach that embeds causal mechanisms. The findings indicate that the integration of causal inference into construction planning enables more accurate identification of factors influencing project duration, enhances synchronization of dependent activities, and minimizes conflicts and idle times. This causally informed framework strengthens decision-making by allowing practitioners to predict the consequences of modifications in project execution strategies. The developed models constitute a robust foundation for future research on leveraging causal inference algorithms and artificial intelligence to advance construction process management.

Applied SciencesVol. 16(1)
Warsaw University of Technology (PL), Kielce University of Technology (PL), AGH University of Krakow (PL), Lublin University of Technology (PL)
Universidade do Minho
Openalex Percentile: Top 29%
Resource-Constrained Project Scheduling
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.