The sustainable economic growth implications of expanding the electricity network: can early investment reduce consumer costs and support greater GDP and jobs gains?

In 2024, the UK Government introduced a statutory ‘Growth Duty’ on the energy industry regulator Ofgem. One implication is that industry actors must explain how proposed investments might enable sustainable economic growth processes when submitting their business plans as part of the regulated energy price control system. The first instance of this requirement affected the three GB electricity transmission owners (TOs) when submitting business plans in late 2024 for the RIIO-T3 period, which will run from April 2026 through to March 2031. This paper reports results and insights from independent research drawing on the investment plans of one of the three TOs in a set of economy-wide scenario simulations using a dynamic computable general equilibrium (CGE) model of the UK economy. A central finding is that our results indicate that undertaking early, planned investment at pace in anticipation of projected rising electricity demand, in response to the UK Government's electrification policies, is likely to deliver substantially stronger GDP and employment outcomes than a reactionary investment approach. This outcome is due to both an increased scale of earlier investment and the early creation of some excess capacity, which introduces downward marginal pressure on electricity bills. Moreover, where the latter is sufficient to offset the user bill impacts of investment cost recovery, the net outcome for UK households becomes progressive. The commonly expected outcome of cost recovery through energy bills being regressive does, however, manifest if electricity prices do not adjust in a competitive manner. • Electricity network investment is likely to support sustainable economic expansion. • Early anticipatory network investment supports stronger, wider economy expansion. • There is potential for progressive rather than regressive outcomes for households. • Achieving such results requires electricity prices to adjust with network capacity.

Authors

Publication Details

Journal
Utilities Policy
Published
2025-12-24
DOI
https://doi.org/10.1016/j.jup.2025.102140
Primary Topic
Electric Power System Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The sustainable economic growth implications of expanding the electricity network: can early investment reduce consumer costs and support greater GDP and jobs gains?

Karen Turner, Antonios Katris, Anas Karkoutli
Utilities Policy
Electric Power System Optimization
article

The sustainable economic growth implications of expanding the electricity network: can early investment reduce consumer costs and support greater GDP and jobs gains?

Karen Turner, Antonios Katris, Anas Karkoutli
article en

Abstract

In 2024, the UK Government introduced a statutory ‘Growth Duty’ on the energy industry regulator Ofgem. One implication is that industry actors must explain how proposed investments might enable sustainable economic growth processes when submitting their business plans as part of the regulated energy price control system. The first instance of this requirement affected the three GB electricity transmission owners (TOs) when submitting business plans in late 2024 for the RIIO-T3 period, which will run from April 2026 through to March 2031. This paper reports results and insights from independent research drawing on the investment plans of one of the three TOs in a set of economy-wide scenario simulations using a dynamic computable general equilibrium (CGE) model of the UK economy. A central finding is that our results indicate that undertaking early, planned investment at pace in anticipation of projected rising electricity demand, in response to the UK Government's electrification policies, is likely to deliver substantially stronger GDP and employment outcomes than a reactionary investment approach. This outcome is due to both an increased scale of earlier investment and the early creation of some excess capacity, which introduces downward marginal pressure on electricity bills. Moreover, where the latter is sufficient to offset the user bill impacts of investment cost recovery, the net outcome for UK households becomes progressive. The commonly expected outcome of cost recovery through energy bills being regressive does, however, manifest if electricity prices do not adjust in a competitive manner. • Electricity network investment is likely to support sustainable economic expansion. • Early anticipatory network investment supports stronger, wider economy expansion. • There is potential for progressive rather than regressive outcomes for households. • Achieving such results requires electricity prices to adjust with network capacity.

Utilities PolicyVol. 99
Decent work and economic growth
Openalex Percentile: Top 42%
Electric Power System Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.