Stability Evaluation of a Hydraulic Tunnel Subjected to Partial Lining Removal and Variable Cross‐Section Excavation: Implication From Numerical Modelling

ABSTRACT Tunnel expansion in hydraulic projects often involves partial removal of existing linings and construction of variable cross‐section tunnels, which induces significant stress redistribution and may compromise the stability of surrounding rock masses. This study investigates the variable cross‐section tunnel of a hydropower station, where a partial lining demolition and staged excavation approach was adopted in a geologically complex and water‐bearing environment. A refined three‐dimensional numerical model was developed to simulate the coupled excavation‐support process, incorporating structural joints, water pressure, and support elements including sprayed concrete, steel arches, and rockbolts. And the coupling support scheme was used to reinforce the variable cross‐section tunnels, and the reinforcement effect was monitored in situ. The effectiveness of preliminary support and reinforcement measures was also assessed. The simulation results reveal that partial lining demolition induces localized tensile stress (3 MPa), tunnel face displacement (145 mm), and deep plastic zone development (12 m). The implementation of a prestressed anchor reinforcement system significantly constrained deformation, improved the safety factor from 1.88 to over 2.3, and redistributed loads within the remaining lining. Field monitoring data, including axial anchor forces and convergence, validated the numerical predictions. The findings offer practical guidance for support design and safety control in complex tunnel expansions under high water pressure and poor geological conditions.

Authors

Institutions

Publication Details

Journal
International Journal for Numerical and Analytical Methods in Geomechanics
Published
2025-12-23
DOI
https://doi.org/10.1002/nag.70220
Primary Topic
Geotechnical Engineering and Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Stability Evaluation of a Hydraulic Tunnel Subjected to Partial Lining Removal and Variable Cross‐Section Excavation: Implication From Numerical Modelling

Guotao Meng, Yanan Sun, Xianglin Huang, Feng Gao et al.
International Journal for Numerical and Analytical Methods in Geomechanics
Geotechnical Engineering and Analysis
article

Stability Evaluation of a Hydraulic Tunnel Subjected to Partial Lining Removal and Variable Cross‐Section Excavation: Implication From Numerical Modelling

Guotao Meng, Yanan Sun, Xianglin Huang, Feng Gao, Chao Hua, Heyi Yang, Nuwen Xu
article en

Abstract

ABSTRACT Tunnel expansion in hydraulic projects often involves partial removal of existing linings and construction of variable cross‐section tunnels, which induces significant stress redistribution and may compromise the stability of surrounding rock masses. This study investigates the variable cross‐section tunnel of a hydropower station, where a partial lining demolition and staged excavation approach was adopted in a geologically complex and water‐bearing environment. A refined three‐dimensional numerical model was developed to simulate the coupled excavation‐support process, incorporating structural joints, water pressure, and support elements including sprayed concrete, steel arches, and rockbolts. And the coupling support scheme was used to reinforce the variable cross‐section tunnels, and the reinforcement effect was monitored in situ. The effectiveness of preliminary support and reinforcement measures was also assessed. The simulation results reveal that partial lining demolition induces localized tensile stress (3 MPa), tunnel face displacement (145 mm), and deep plastic zone development (12 m). The implementation of a prestressed anchor reinforcement system significantly constrained deformation, improved the safety factor from 1.88 to over 2.3, and redistributed loads within the remaining lining. Field monitoring data, including axial anchor forces and convergence, validated the numerical predictions. The findings offer practical guidance for support design and safety control in complex tunnel expansions under high water pressure and poor geological conditions.

International Journal for Numerical and Analytical Methods in GeomechanicsVol. 50(5)
Sichuan University (CN), China University of Mining and Technology (CN), Zhejiang Water Conservancy and Hydropower Survey and Design Institute (CN), China Power Engineering Consulting Group (China) (CN)
Sustainable cities and communities
Openalex Percentile: Top 37%
Geotechnical Engineering and Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.