Cost efficient electrification: Enhanced construction assurance using high-resolution as-fitted static wire profiles to identify allocation and construction errors
A novel construction assurance methodology was developed and tested on the Overhead Line Equipment (OLE) as part of the Midland Mainline Electrification (MMLE) Kettering to Wigston (K2W) project in the UK. Implemented alongside the National Technical Specification Notices (NTSN) Energy (ENE) standard (section 6.2.4.5), this approach ensures compliance while reducing project duration, minimising interface complexities, and lowering costs by quantifying pantograph-OLE dynamic performance to as-fitted OLE. High-resolution, non-contact measurement techniques captured the static geometry, which was subsequently analysed using OLE StAT© - a Static Analysis Toolbox specially designed for this application. By overlaying design and installed geometry, deviations impacting dynamic performance were identified and categorised as allocation or construction errors via automated root cause analysis. The methodology meets NTSN construction assurance requirements while streamlining quality control, regulatory compliance, and project efficiency. It offers a powerful, new, cost-effective solution for optimising OLE construction, ensuring safe dynamic performance, and improving overall electrification project delivery.
Authors
- Nikolaos Baimpas
- A Johnson (ORCID: https://orcid.org/0009-0003-5490-5411)
- Simon Skinner
- Tulay Ercan
- Alexander J. G. Lunt
- Nick Pekridis
Institutions
- Powerline Technologies (United Kingdom) (GB)
- University of Bath (GB)
- Network Rail (GB)
Publication Details
- Journal
- Proceedings of the Institution of Mechanical Engineers Part F Journal of Rail and Rapid Transit
- Published
- 2025-12-22
- DOI
- https://doi.org/10.1177/09544097251409845
- Primary Topic
- Thermal Analysis in Power Transmission
- Type
- article
- Field-Weighted Citation Impact
- 0.00