Research on Joint Regulation Strategy of Water Conservancy Project Group in the Multi-Branch Channels of the Ganjiang River Tail for Coping with Dry Events

The problem of low water level and uneven distribution of flow in the multi-branch channels at the tail of the Ganjiang River (GJRT) during the dry season has been affecting the local water supply, navigation, and aquatic ecological environment. In recent years, water conservancy projects have been built in each branch of the multi-branch channels at the GJRT. Finding a way to utilize the water conservancy project group to carry out joint regulation and meet the water level and discharge requirements of each branch is an important issue that urgently needs to be solved. This paper analyzes the hydrodynamic process and its impact on water supply, navigation, and ecology in multi-branch channels without water conservation projects through hydrological data analysis and numerical simulation. By conducting numerical experiments on joint regulation of water conservation project group, a multi-objective regulation strategy is proposed to meet the water level and discharge of each branch. The results indicate that the discharge at the GJRT has been continuously decreasing from 1 September. Due to the jacking effect of Poyang Lake, the water level plunges at the GJRT from 1 October, which occurred later than the decrease in water level. The disruption of water levels and discharge makes it difficult to meet the regional water demand. The optimal time to initiate regulation is 1 October, and the target water level of Waizhou Station is 15.5 m, located upstream of the Ganjiang River tail. When the water level before each branch project gate is uniform and exceeds 15.5 m, the water level of Waizhou Station satisfies the requirement. However, the discharge of each branch does not meet the demand. In contrast to a scheduling regulation strategy that maintains the same water level in front of each gate, adopting a strategy with different water levels before each gate can effectively adjust the diversion ratio and fulfill the discharge demand of each branch at the tail of the Ganjiang River.

Authors

Institutions

Publication Details

Journal
Water
Published
2025-12-19
DOI
https://doi.org/10.3390/w18010013
Primary Topic
Hydrology and Watershed Management Studies
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on Joint Regulation Strategy of Water Conservancy Project Group in the Multi-Branch Channels of the Ganjiang River Tail for Coping with Dry Events

Yue Liu, Taotao Zhang, Yang Xia, Zhichao Wang et al.
Water
Hydrology and Watershed Management Studies
article

Research on Joint Regulation Strategy of Water Conservancy Project Group in the Multi-Branch Channels of the Ganjiang River Tail for Coping with Dry Events

Yue Liu, Taotao Zhang, Yang Xia, Zhichao Wang, Wensun You, Zhiwen Huang
article en

Abstract

The problem of low water level and uneven distribution of flow in the multi-branch channels at the tail of the Ganjiang River (GJRT) during the dry season has been affecting the local water supply, navigation, and aquatic ecological environment. In recent years, water conservancy projects have been built in each branch of the multi-branch channels at the GJRT. Finding a way to utilize the water conservancy project group to carry out joint regulation and meet the water level and discharge requirements of each branch is an important issue that urgently needs to be solved. This paper analyzes the hydrodynamic process and its impact on water supply, navigation, and ecology in multi-branch channels without water conservation projects through hydrological data analysis and numerical simulation. By conducting numerical experiments on joint regulation of water conservation project group, a multi-objective regulation strategy is proposed to meet the water level and discharge of each branch. The results indicate that the discharge at the GJRT has been continuously decreasing from 1 September. Due to the jacking effect of Poyang Lake, the water level plunges at the GJRT from 1 October, which occurred later than the decrease in water level. The disruption of water levels and discharge makes it difficult to meet the regional water demand. The optimal time to initiate regulation is 1 October, and the target water level of Waizhou Station is 15.5 m, located upstream of the Ganjiang River tail. When the water level before each branch project gate is uniform and exceeds 15.5 m, the water level of Waizhou Station satisfies the requirement. However, the discharge of each branch does not meet the demand. In contrast to a scheduling regulation strategy that maintains the same water level in front of each gate, adopting a strategy with different water levels before each gate can effectively adjust the diversion ratio and fulfill the discharge demand of each branch at the tail of the Ganjiang River.

WaterVol. 18(1)
Hohai University (CN), Suzhou University of Science and Technology (CN), State Key Laboratory of Hydrology-Water Resources and Hydraulic Engineering (CN), Jiangxi Provincial Institute of Water Sciences (CN), Jiangxi Academy of Environmental Sciences (CN), Ministry of Water Resources of the People's Republic of China (CN)
Natural Science Foundation of Jiangxi Province, Agencia Estatal de Investigación
Openalex Percentile: Top 38%
Hydrology and Watershed Management Studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.