Evaluating contractor performance in water projects using k-means, hierarchical methods, and fuzzy AHP

• The study uses FAHP and clustering methods to evaluate 37 water contractors, improving decision-making. • The study highlights the need for multi-criteria methods to assess contractors on performance criteria like response times. • PCA was used to visualize clustering results, clarifying contractor performance distributions and identifying outliers. • Fuzzy AHP ranked contractor R1 as the top performer, followed by R14 and R16, showing the value of expert judgment. • Clustering identified six outliers (R14, R1, R16, R19, R25, R27), indicating significant performance deviations needing investigation. Contractor performance evaluation in water-infrastructure projects is a multi-criteria and uncertainty-prone task. This study applies two analytical paths to assess 37 water-distribution contractors using six ratio-based performance criteria. First, Fuzzy Analytic Hierarchy Process (FAHP) is used to weight the criteria under pooled expert judgments and to produce an uncertainty-aware contractor ranking. Second, K-means and Agglomerative clustering are applied independently to the same weighted, standardized performance data to identify similarity-based contractor groups and stable outliers. The clustering results consistently revealed six outliers (R14, R1, R16, R19, R25, and R27), indicating contractors with performance profiles that deviate sharply from the majority. FAHP ranked R1 as the top contractor, followed by R14 and R16, while R27 placed 34th. Comparing the independent clustering structure with the FAHP ordering provides a triangulated interpretation that validates high- and low-performance patterns and highlights exceptional or problematic contractors for managerial attention. The proposed FAHP–clustering framework strengthens robustness and transparency in contractor evaluation and supports more reliable decision-making in project management.

Authors

Institutions

Publication Details

Journal
Results in Engineering
Published
2025-12-21
DOI
https://doi.org/10.1016/j.rineng.2025.108836
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Evaluating contractor performance in water projects using k-means, hierarchical methods, and fuzzy AHP

Maryam Mousavifard, Ali Poorkarimi, Sara Ahmadi
Results in Engineering
Construction Project Management and Performance
article

Evaluating contractor performance in water projects using k-means, hierarchical methods, and fuzzy AHP

Maryam Mousavifard, Ali Poorkarimi, Sara Ahmadi
article en

Abstract

• The study uses FAHP and clustering methods to evaluate 37 water contractors, improving decision-making. • The study highlights the need for multi-criteria methods to assess contractors on performance criteria like response times. • PCA was used to visualize clustering results, clarifying contractor performance distributions and identifying outliers. • Fuzzy AHP ranked contractor R1 as the top performer, followed by R14 and R16, showing the value of expert judgment. • Clustering identified six outliers (R14, R1, R16, R19, R25, R27), indicating significant performance deviations needing investigation. Contractor performance evaluation in water-infrastructure projects is a multi-criteria and uncertainty-prone task. This study applies two analytical paths to assess 37 water-distribution contractors using six ratio-based performance criteria. First, Fuzzy Analytic Hierarchy Process (FAHP) is used to weight the criteria under pooled expert judgments and to produce an uncertainty-aware contractor ranking. Second, K-means and Agglomerative clustering are applied independently to the same weighted, standardized performance data to identify similarity-based contractor groups and stable outliers. The clustering results consistently revealed six outliers (R14, R1, R16, R19, R25, and R27), indicating contractors with performance profiles that deviate sharply from the majority. FAHP ranked R1 as the top contractor, followed by R14 and R16, while R27 placed 34th. Comparing the independent clustering structure with the FAHP ordering provides a triangulated interpretation that validates high- and low-performance patterns and highlights exceptional or problematic contractors for managerial attention. The proposed FAHP–clustering framework strengthens robustness and transparency in contractor evaluation and supports more reliable decision-making in project management.

Results in EngineeringVol. 29
University of Isfahan (IR), Fasa University of Medical Sciences (IR), Fasa University
Industry, innovation and infrastructure
Openalex Percentile: Top 30%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.