• Performance degradation of hydropower plant. • Spilling and dam failure in hydropower plant. • Rehabilitation of hydropower plant. • Converting a hydropower plant into multipurpose facility. The 300 MW Tekeze hydropower plant, in Ethiopia, is facing premature performance degradation and technical challenges that are endangering its continued operation. This study conducted a comprehensive assessment of the power plant and identified critical issues including but not limited to severe unit vibration, design flaws that prevented power generation while spilling, outage, transmission line and dam safety vulnerabilities, considerable energy wastage accounted during planned and forced spillage. Through field inspection, data analysis, and numerical modeling, this study proposed targeted upgrading and expansion intervention solutions. These include redirecting the transmission line through a new tunnel, indoor housing of the transformers, adding two new 75 MW units, and exploring a multipurpose expansion with pumping facilities for energy dissipation. The technical results demonstrate that the proposed upgrading improves governor stability and hydraulic transients. The proposed upgrading interventions are paramount important to prevent the plant’s premature death, restore the plant’s capacity, and enhance its operational flexibility and safety. This seeks the attention of the Ethiopian government and development partners to avert the prevailing premature infrastructure, economic losses, and associated consequences.

Authors

Institutions

Publication Details

Journal
Energy Conversion and Management X
Published
2025-12-20
DOI
https://doi.org/10.1016/j.ecmx.2025.101480
Primary Topic
Dam Engineering and Safety
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Prevent a premature death of a 300 MW hydropower plant: upgrading Tekeze hydropower plant

Leif Lia, Asfafaw Haileselassie Tesfay, Kaspar Vereide
Energy Conversion and Management X
Dam Engineering and Safety
article

Prevent a premature death of a 300 MW hydropower plant: upgrading Tekeze hydropower plant

Leif Lia, Asfafaw Haileselassie Tesfay, Kaspar Vereide
article en

Abstract

• Performance degradation of hydropower plant. • Spilling and dam failure in hydropower plant. • Rehabilitation of hydropower plant. • Converting a hydropower plant into multipurpose facility. The 300 MW Tekeze hydropower plant, in Ethiopia, is facing premature performance degradation and technical challenges that are endangering its continued operation. This study conducted a comprehensive assessment of the power plant and identified critical issues including but not limited to severe unit vibration, design flaws that prevented power generation while spilling, outage, transmission line and dam safety vulnerabilities, considerable energy wastage accounted during planned and forced spillage. Through field inspection, data analysis, and numerical modeling, this study proposed targeted upgrading and expansion intervention solutions. These include redirecting the transmission line through a new tunnel, indoor housing of the transformers, adding two new 75 MW units, and exploring a multipurpose expansion with pumping facilities for energy dissipation. The technical results demonstrate that the proposed upgrading improves governor stability and hydraulic transients. The proposed upgrading interventions are paramount important to prevent the plant’s premature death, restore the plant’s capacity, and enhance its operational flexibility and safety. This seeks the attention of the Ethiopian government and development partners to avert the prevailing premature infrastructure, economic losses, and associated consequences.

Energy Conversion and Management XVol. 29
Norwegian University of Science and Technology (NO), Mekelle University (ET)
Industry, innovation and infrastructure
Openalex Percentile: Top 38%
Dam Engineering and Safety
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.