Enhancing Reliability Indices in Power Distribution Grids Through the Optimal Placement of Redundant Lines Using a Teaching–Learning-Based Optimization Approach

Given the pressing need to strengthen operational reliability in electrical distribution networks, this study proposes an optimization methodology based on the Teaching–Learning-Based Optimization (TLBO) algorithm for the strategic location of redundant lines. The model is validated on the “MV Distribution Network—Base Model” test system, considering the combination of the MTBF (Mean Time Between Failures) and MTTR (Mean Time To Repair) indicators as the objective function. After 500 independent runs, it is determined that the configuration with three redundant lines identified as LN_1011, LN_1058, and LN_0871 offers the most stable solution. Specifically, this topology increases the MTBF from 403.64 h to 409.42 h and reduces the MTTR from 2.351 h to 2.306 h. In addition, significant improvements are observed in the voltage profile and angle, along with a more balanced redistribution of active and reactive power, more efficient use of existing lines, and an overall reduction in energy losses.

Publication Details

Journal
Energies
Published
2025-12-18
DOI
https://doi.org/10.3390/en18246612
Primary Topic
Power System Reliability and Maintenance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Enhancing Reliability Indices in Power Distribution Grids Through the Optimal Placement of Redundant Lines Using a Teaching–Learning-Based Optimization Approach

Energies
Power System Reliability and Maintenance
article

Enhancing Reliability Indices in Power Distribution Grids Through the Optimal Placement of Redundant Lines Using a Teaching–Learning-Based Optimization Approach

article en

Abstract

Given the pressing need to strengthen operational reliability in electrical distribution networks, this study proposes an optimization methodology based on the Teaching–Learning-Based Optimization (TLBO) algorithm for the strategic location of redundant lines. The model is validated on the “MV Distribution Network—Base Model” test system, considering the combination of the MTBF (Mean Time Between Failures) and MTTR (Mean Time To Repair) indicators as the objective function. After 500 independent runs, it is determined that the configuration with three redundant lines identified as LN_1011, LN_1058, and LN_0871 offers the most stable solution. Specifically, this topology increases the MTBF from 403.64 h to 409.42 h and reduces the MTTR from 2.351 h to 2.306 h. In addition, significant improvements are observed in the voltage profile and angle, along with a more balanced redistribution of active and reactive power, more efficient use of existing lines, and an overall reduction in energy losses.

EnergiesVol. 18(24)
Affordable and clean energy
Openalex Percentile: Top 38%
Power System Reliability and Maintenance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.