Engineering economics feasibility analysis of the Takisung Bridge construction package in South Kalimantan Province

The development of transportation infrastructure, particularly bridges, plays a strategic role in enhancing regional connectivity, accelerating economic growth, and supporting the tourism sector. The Takisung Bridge in Tanah Laut Regency, South Kalimantan Province, serves as the primary access to the Takisung Beach tourist destination and has suffered damage due to seawater abrasion. This deterioration has limited the bridge's functionality in facilitating community mobility and sustaining local economic distribution. The objective of this research is to analyze the engineer economic feasibility of the Takisung Bridge development project, ensuring that the benefits accrued to the community outweigh the costs incurred. This analysis employs the Discounted Cash Flow (DCF) method with evaluation parameters including Net Present Value (NPV), Benefit-Cost Ratio (BCR), and Internal Rate of Return (IRR). The data used in this study includes secondary data from bridge planning documents, as well as primary data from Average Daily Traffic (ADT) surveys to calculate Vehicle Operating Costs (VOC) as a project benefit. The research findings indicate that the Net Present Value (NPV) is positive and the Benefit-Cost Ratio (BCR) meets the feasibility criteria, signifying that the bridge construction project is economically viable.

Publication Details

Journal
Springer Link (Chiba Institute of Technology)
Published
2025-12-12
DOI
https://doi.org/10.1051/e3sconf/202567706014/pdf
Primary Topic
Value Engineering and Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Engineering economics feasibility analysis of the Takisung Bridge construction package in South Kalimantan Province

Springer Link (Chiba Institute of Technology)
Value Engineering and Management
article

Engineering economics feasibility analysis of the Takisung Bridge construction package in South Kalimantan Province

article en

Abstract

The development of transportation infrastructure, particularly bridges, plays a strategic role in enhancing regional connectivity, accelerating economic growth, and supporting the tourism sector. The Takisung Bridge in Tanah Laut Regency, South Kalimantan Province, serves as the primary access to the Takisung Beach tourist destination and has suffered damage due to seawater abrasion. This deterioration has limited the bridge's functionality in facilitating community mobility and sustaining local economic distribution. The objective of this research is to analyze the engineer economic feasibility of the Takisung Bridge development project, ensuring that the benefits accrued to the community outweigh the costs incurred. This analysis employs the Discounted Cash Flow (DCF) method with evaluation parameters including Net Present Value (NPV), Benefit-Cost Ratio (BCR), and Internal Rate of Return (IRR). The data used in this study includes secondary data from bridge planning documents, as well as primary data from Average Daily Traffic (ADT) surveys to calculate Vehicle Operating Costs (VOC) as a project benefit. The research findings indicate that the Net Present Value (NPV) is positive and the Benefit-Cost Ratio (BCR) meets the feasibility criteria, signifying that the bridge construction project is economically viable.

Springer Link (Chiba Institute of Technology)
Openalex Percentile: Top 28%
Value Engineering and Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.