More light in the tunnel of Eupalinos

The restoration works on the unique tunnel of Eupalinos, part of the Archaic aqueduct on Samos, and the information that the new evidence from them provides, especially on its linings, are presented in brief. New hypotheses for the design and the construction of the tunnel are also proposed. The center line of the tunnel was initially laid out over the hill surface with long scaffolding. Then, in order to ensure the accuracy of the excavation, the line was transposed inside with the help of two light signals, one on the opposite hillside to the north and one on a wooden tower near the seaside to the south. The problem of the loss of the northern signal on account of low visibility caused by the flow of water, which produced high humidity and consequently a misty atmosphere inside the tunnel, was solved by Eupalinos by the modification of driving a V-shaped deviation, by which he approached the target correctly and succeeded in making an exact breakthrough. The level of the tunnel was defined accurately in the initial design. The trench on the east side of the tunnel was also part of the initial design and was excavated simultaneously with the tunnel itself: it facilitated proper ventilation during the excavation. No more than four years were needed to finish construction.

Publication Details

Journal
DAI
Published
2025-04-29
DOI
https://doi.org/10.34780/aw6fpw08
Primary Topic
Water management and technologies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

More light in the tunnel of Eupalinos

DAI
Water management and technologies
article

More light in the tunnel of Eupalinos

article en

Abstract

The restoration works on the unique tunnel of Eupalinos, part of the Archaic aqueduct on Samos, and the information that the new evidence from them provides, especially on its linings, are presented in brief. New hypotheses for the design and the construction of the tunnel are also proposed. The center line of the tunnel was initially laid out over the hill surface with long scaffolding. Then, in order to ensure the accuracy of the excavation, the line was transposed inside with the help of two light signals, one on the opposite hillside to the north and one on a wooden tower near the seaside to the south. The problem of the loss of the northern signal on account of low visibility caused by the flow of water, which produced high humidity and consequently a misty atmosphere inside the tunnel, was solved by Eupalinos by the modification of driving a V-shaped deviation, by which he approached the target correctly and succeeded in making an exact breakthrough. The level of the tunnel was defined accurately in the initial design. The trench on the east side of the tunnel was also part of the initial design and was excavated simultaneously with the tunnel itself: it facilitated proper ventilation during the excavation. No more than four years were needed to finish construction.

DAI
Sustainable cities and communities
Openalex Percentile: Top 26%
Water management and technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.