Research on the Flexible Job Shop Scheduling Problem with Job Priorities Considering Transportation Time and Setup Time

This paper addresses the flexible job-shop scheduling problem with multiple time factors—namely, transportation time and setup time—as well as job priorities (referred to as FJSP-JPC-TST). An optimization model is established with the objective of minimizing the completion time. Considering the characteristics of the FJSP-JPC-TST, we propose an improved whale optimization algorithm that incorporates multiple strategies. First, a two-layer encoding mechanism based on operations and machines is introduced. To prevent illegal solutions, a priority-based encoding repair mechanism is designed, along with an active scheduling decoding method that fully considers multiple time factors and job priorities. Subsequently, a multi-level sub-population optimization strategy, an adaptive inertia weight, and a cross-population differential evolution strategy are implemented to enhance the optimization efficiency of the algorithm. Finally, extensive simulation experiments demonstrate that the proposed algorithm offers significant advantages and exhibits high reliability in effectively solving such scheduling problems.

Institutions

Publication Details

Journal
Axioms
Published
2025-12-12
DOI
https://doi.org/10.3390/axioms14120914
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on the Flexible Job Shop Scheduling Problem with Job Priorities Considering Transportation Time and Setup Time

Axioms
Scheduling and Optimization Algorithms
article

Research on the Flexible Job Shop Scheduling Problem with Job Priorities Considering Transportation Time and Setup Time

article en

Abstract

This paper addresses the flexible job-shop scheduling problem with multiple time factors—namely, transportation time and setup time—as well as job priorities (referred to as FJSP-JPC-TST). An optimization model is established with the objective of minimizing the completion time. Considering the characteristics of the FJSP-JPC-TST, we propose an improved whale optimization algorithm that incorporates multiple strategies. First, a two-layer encoding mechanism based on operations and machines is introduced. To prevent illegal solutions, a priority-based encoding repair mechanism is designed, along with an active scheduling decoding method that fully considers multiple time factors and job priorities. Subsequently, a multi-level sub-population optimization strategy, an adaptive inertia weight, and a cross-population differential evolution strategy are implemented to enhance the optimization efficiency of the algorithm. Finally, extensive simulation experiments demonstrate that the proposed algorithm offers significant advantages and exhibits high reliability in effectively solving such scheduling problems.

AxiomsVol. 14(12)
Harbin University of Science and Technology (CN)
Decent work and economic growth
Openalex Percentile: Top 36%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Research on the Flexible Job Shop Scheduling Problem with Job Priorities Considering Transportation Time and Setup Time · Axioms (2025) | TGRS Research Map | TGRS