Machine Learning strategieën voor het verbeteren van computationele efficientie voor windmolenpark modellering

Current operational wind resources forecasting models (e.g. used for market bidding strategies or planning of ancillary services), do not consider effects of two-way coupling in large off-shore wind farms. With modern wind turbines reaching capacities of up to 9.5 MW and heights of up to 220m, and considering the planning of large wind farm clusters in Europe's North-Sea region, the inclusion of these effects is important. Currently, neither planning tools, nor operational forecasting tools take two-way meso-scale coupling into account. As a case study, the Belgian offshore zone and Belgian's offshore wind farms are considered. This PhD will work on developing the algorithm for the forecasting of the wind resources. The algorithm will be based on the operational weather forecasts adjusted for the effect of feedback processes using mesoscale atmospheric model integrations at a resolution of 0.3 km together with an atmospheric pertubation model (developed by the KU Leuven). Ultimately, this PhD aims to develop a tool for wind resource forecasts ranging from 1 to 7 days.

Publication Details

Journal
Lirias (KU Leuven)
Published
2025-01-15
Primary Topic
Energy Load and Power Forecasting
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Machine Learning strategieën voor het verbeteren van computationele efficientie voor windmolenpark modellering

Lirias (KU Leuven)
Energy Load and Power Forecasting
article

Machine Learning strategieën voor het verbeteren van computationele efficientie voor windmolenpark modellering

article en

Abstract

Current operational wind resources forecasting models (e.g. used for market bidding strategies or planning of ancillary services), do not consider effects of two-way coupling in large off-shore wind farms. With modern wind turbines reaching capacities of up to 9.5 MW and heights of up to 220m, and considering the planning of large wind farm clusters in Europe's North-Sea region, the inclusion of these effects is important. Currently, neither planning tools, nor operational forecasting tools take two-way meso-scale coupling into account. As a case study, the Belgian offshore zone and Belgian's offshore wind farms are considered. This PhD will work on developing the algorithm for the forecasting of the wind resources. The algorithm will be based on the operational weather forecasts adjusted for the effect of feedback processes using mesoscale atmospheric model integrations at a resolution of 0.3 km together with an atmospheric pertubation model (developed by the KU Leuven). Ultimately, this PhD aims to develop a tool for wind resource forecasts ranging from 1 to 7 days.

Lirias (KU Leuven)
Affordable and clean energy
Openalex Percentile: Top 44%
Energy Load and Power Forecasting
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Machine Learning strategieën voor het verbeteren van computationele efficientie voor windmolenpark modellering · Lirias (KU Leuven) (2025) | TGRS Research Map | TGRS