EWRP management of clarifier sludge

The Emalahleni Water Reclamation Plant (EWRP) treats acidic mine water from five mining operations. The feeds vary from a pH of 6 to a pH as low as 2.3. Over the last few years, the water qualities have deteriorated drastically. Mine life-extension projects have also required the removal of more acidic water, which has altered the total feed composition to the EWRP. This change specifically came about in the form of iron load. The initial design of the treatment process was to treat iron levels up to 300mg/l. The incoming feed quality at the time was more than 450mg/l IRON. From November 2023 to January 2024, the mining operation was almost completely stopped due to an excessive amount of water. Due to significant production pressure, the operation had to adapt and treat the higher iron loads with no time to make significant design, construction or installation changes. The biggest challenge was clarifying the water, as iron is typically a low-density substance that struggles to settle at higher throughputs. This began an eight-month journey with many ideas, failures, theories, and eventually success. At the end of April 2024, all the water-related stoppages were resolved and by June 2024 the mine was dry and operations could continue.

Publication Details

Journal
Springer Link (Chiba Institute of Technology)
Published
2025-11-10
DOI
https://doi.org/10.1051/matecconf/202541601005/pdf
Primary Topic
Mine drainage and remediation techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

EWRP management of clarifier sludge

Springer Link (Chiba Institute of Technology)
Mine drainage and remediation techniques
article

EWRP management of clarifier sludge

article en

Abstract

The Emalahleni Water Reclamation Plant (EWRP) treats acidic mine water from five mining operations. The feeds vary from a pH of 6 to a pH as low as 2.3. Over the last few years, the water qualities have deteriorated drastically. Mine life-extension projects have also required the removal of more acidic water, which has altered the total feed composition to the EWRP. This change specifically came about in the form of iron load. The initial design of the treatment process was to treat iron levels up to 300mg/l. The incoming feed quality at the time was more than 450mg/l IRON. From November 2023 to January 2024, the mining operation was almost completely stopped due to an excessive amount of water. Due to significant production pressure, the operation had to adapt and treat the higher iron loads with no time to make significant design, construction or installation changes. The biggest challenge was clarifying the water, as iron is typically a low-density substance that struggles to settle at higher throughputs. This began an eight-month journey with many ideas, failures, theories, and eventually success. At the end of April 2024, all the water-related stoppages were resolved and by June 2024 the mine was dry and operations could continue.

Springer Link (Chiba Institute of Technology)
Clean water and sanitation
Openalex Percentile: Top 42%
Mine drainage and remediation techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.