Contribution of AHP method in prioritizing risk factors regarding tunnel project phases

Tunnel projects are consistently regarded to be mostly a complex and risky engineering projects, owing to the features of the projects, since they increasingly achieve high risk and complexity during the execution of the project. this led to the fact that the necessity of risk management understanding and implementing is a crucial quest with the intention to obtain tunnel project objectives considering (time, cost, quality & safety) to avoid time and cost overruns and any other obstacles. it was observed the most affecting objective was Safety (47.3%) by AHP method in which it is actually reasonable as such project of tunnel need a great concern regarding that matter for many reasons for instance the closed construction area, ventilation considerations, blasting, and so on. the second major objective is quality (31.1%) in which as experts always say it has to be maintained as a high quality as possible.

Publication Details

Journal
Periodicals of Engineering and Natural Sciences (PEN)
Published
2025-12-05
DOI
https://doi.org/10.21533/pen.v8.i4.1419
Primary Topic
Tunneling and Rock Mechanics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Contribution of AHP method in prioritizing risk factors regarding tunnel project phases

Periodicals of Engineering and Natural Sciences (PEN)
Tunneling and Rock Mechanics
article

Contribution of AHP method in prioritizing risk factors regarding tunnel project phases

article en

Abstract

Tunnel projects are consistently regarded to be mostly a complex and risky engineering projects, owing to the features of the projects, since they increasingly achieve high risk and complexity during the execution of the project. this led to the fact that the necessity of risk management understanding and implementing is a crucial quest with the intention to obtain tunnel project objectives considering (time, cost, quality & safety) to avoid time and cost overruns and any other obstacles. it was observed the most affecting objective was Safety (47.3%) by AHP method in which it is actually reasonable as such project of tunnel need a great concern regarding that matter for many reasons for instance the closed construction area, ventilation considerations, blasting, and so on. the second major objective is quality (31.1%) in which as experts always say it has to be maintained as a high quality as possible.

Periodicals of Engineering and Natural Sciences (PEN)Vol. 8(4)
Industry, innovation and infrastructure
Openalex Percentile: Top 45%
Tunneling and Rock Mechanics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.