Enhancing safety and psychological capital in construction worker resource scheduling

To tackle the resource scheduling challenges encountered by construction workers, while taking into account safety constraints and psychological capital, we have developed a multi-objective resource scheduling model tailored for multi-skilled construction teams.This model aims to achieve three key objectives: minimizing project costs, reducing completion time, and enhancing safety performance. To address the complexities of this model, we developed an enhanced Grey Wolf Optimization( GWO) algorithm that overcomes the limitations of the basic GWO, including its vulnerability to local optima, premature convergence, and restricted global search capability. This improved version incorporates a dual-layer encoding scheme to better reflect real-world scenarios, along with opposition-based learning to enhance the quality of the initial population. To further improve the quality and efficiency of the solution set, an adaptive hunting weight mechanism was integrated to optimize position updates. Additionally, crossover and mutation operators from genetic algorithms were applied to enhance overall algorithm performance. The effectiveness of the proposed algorithm was assessed through experiments conducted on both simulated datasets and real-world enterprise cases. The results were compared across three metrics(IGD,C-metric, and iteration speed) and three objective outcomes. For the Inverted Generational Distance(IGD) metric, the Multi-Strategy Hybrid Grey Wolf Optimization(MSHGWO) algorithm demonstrates a value significantly closer to 0, indicating superior convergence, while the IGD values of other algorithms are closer to 1. Regarding theC-metric, the MSHGWO algorithm approaches 1,whereas the C values of the other algorithms are nearer to 0, highlighting its dominance in Pareto optimality. Furthermore, in terms of output objectives, the MSHGWO algorithm achieves the lowest costs, the shortest project duration, and the highest safety performance.The experiments demonstrated that the MSHGWO algorithm outperformed traditional GWO as well as two other improved GWO variants across various evaluation metrics and objectives. This algorithm offers a more efficient and safer resource allocation strategy for construction workers.

Publication Details

Journal
Nottingham Trent University's Institutional Repository (Nottingham Trent Repository)
Published
2025-10-31
DOI
https://doi.org/10.13637/j.issn.1009-6094.2024.2203
Primary Topic
Occupational Health and Safety Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Enhancing safety and psychological capital in construction worker resource scheduling

Nottingham Trent University's Institutional Repository (Nottingham Trent Repository)
Occupational Health and Safety Research
article

Enhancing safety and psychological capital in construction worker resource scheduling

article en

Abstract

To tackle the resource scheduling challenges encountered by construction workers, while taking into account safety constraints and psychological capital, we have developed a multi-objective resource scheduling model tailored for multi-skilled construction teams.This model aims to achieve three key objectives: minimizing project costs, reducing completion time, and enhancing safety performance. To address the complexities of this model, we developed an enhanced Grey Wolf Optimization( GWO) algorithm that overcomes the limitations of the basic GWO, including its vulnerability to local optima, premature convergence, and restricted global search capability. This improved version incorporates a dual-layer encoding scheme to better reflect real-world scenarios, along with opposition-based learning to enhance the quality of the initial population. To further improve the quality and efficiency of the solution set, an adaptive hunting weight mechanism was integrated to optimize position updates. Additionally, crossover and mutation operators from genetic algorithms were applied to enhance overall algorithm performance. The effectiveness of the proposed algorithm was assessed through experiments conducted on both simulated datasets and real-world enterprise cases. The results were compared across three metrics(IGD,C-metric, and iteration speed) and three objective outcomes. For the Inverted Generational Distance(IGD) metric, the Multi-Strategy Hybrid Grey Wolf Optimization(MSHGWO) algorithm demonstrates a value significantly closer to 0, indicating superior convergence, while the IGD values of other algorithms are closer to 1. Regarding theC-metric, the MSHGWO algorithm approaches 1,whereas the C values of the other algorithms are nearer to 0, highlighting its dominance in Pareto optimality. Furthermore, in terms of output objectives, the MSHGWO algorithm achieves the lowest costs, the shortest project duration, and the highest safety performance.The experiments demonstrated that the MSHGWO algorithm outperformed traditional GWO as well as two other improved GWO variants across various evaluation metrics and objectives. This algorithm offers a more efficient and safer resource allocation strategy for construction workers.

Nottingham Trent University's Institutional Repository (Nottingham Trent Repository)
Decent work and economic growth
Openalex Percentile: Top 35%
Occupational Health and Safety Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.