KEK electron/positron injector LINAC control system

Since May 2019, the KEK electron/positron injector LINAC has successfully conducted simultaneous top-up injections into four independent storage rings and a positron damping ring. To ensure long-term stable beam operation under such a complex operational scheme, maintaining high availability of the entire control system is essential. The original LINAC control system, developed in the 1990s, was based on a proprietary in-house software framework utilizing Unix servers, VME bus systems, and PLCs. Its operator interface was implemented using the Tcl/Tk scripting language and supported approximately 3,500 control points. To improve development efficiency and enhance compatibility with other accelerator control systems, the LINAC control system has been progressively migrated from this legacy platform to an EPICS-based architecture. As a result, the system now supports approximately 200,000 control points. In addition, Linux-based hyper-converged servers, a PXI bus-based system, and in-house embedded frontends have also been implemented. In this paper, we provide a detailed overview of the current status of the KEK injector LINAC control system, along with prospects for its future development.

Publication Details

Journal
JACOW
Published
2025-12-05
DOI
https://doi.org/10.18429/jacow-icalepcs2025-tupd058
Primary Topic
Particle Accelerators and Free-Electron Lasers
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

KEK electron/positron injector LINAC control system

JACOW
Particle Accelerators and Free-Electron Lasers
article

KEK electron/positron injector LINAC control system

article en

Abstract

Since May 2019, the KEK electron/positron injector LINAC has successfully conducted simultaneous top-up injections into four independent storage rings and a positron damping ring. To ensure long-term stable beam operation under such a complex operational scheme, maintaining high availability of the entire control system is essential. The original LINAC control system, developed in the 1990s, was based on a proprietary in-house software framework utilizing Unix servers, VME bus systems, and PLCs. Its operator interface was implemented using the Tcl/Tk scripting language and supported approximately 3,500 control points. To improve development efficiency and enhance compatibility with other accelerator control systems, the LINAC control system has been progressively migrated from this legacy platform to an EPICS-based architecture. As a result, the system now supports approximately 200,000 control points. In addition, Linux-based hyper-converged servers, a PXI bus-based system, and in-house embedded frontends have also been implemented. In this paper, we provide a detailed overview of the current status of the KEK injector LINAC control system, along with prospects for its future development.

JACOW
Industry, innovation and infrastructure
Openalex Percentile: Top 47%
Particle Accelerators and Free-Electron Lasers
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

KEK electron/positron injector LINAC control system · JACOW (2025) | TGRS Research Map | TGRS