Testing the PMTs Underwater Units with a new pressure vessel for the Hyper-K experiment

Poster presented at the XXI International Workshop on Neutrino Telescopes - Padova 29 September - 3 October 2025 (https://agenda.infn.it/event/44606/) Abstract: The Hyper-Kamiokande (HK) neutrino experiment is currently under construction in Japan, with data taking scheduled to begin in early 2028. The detector will be a huge tank filled with 258 kton of ultrapure water divided into Inner Detector (ID) and Outer Detector (OD). More than 20000 50-cm PMTs and 800 multi-PMTs will face the inside of the ID, while the OD will be equipped with approximately 3600 8-cm PMTs to provide the veto for the ID. Next year, an intense assembly phase will be carried out at CERN, where the Underwater Units (UU) housing the electronics of PMTs will be assembled, tested and validated for shipment to Japan. A newly developed test vessel will evaluate both ID and OD UUs under the same pressure and thermal conditions as the final detector. The fully automated tests will verify the tightness of new feed-throughs and mechanical components, and will monitor internal pressure, temperature, and humidity, with all data stored in the HK database.

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2025-12-05
DOI
https://doi.org/10.5281/zenodo.17828646
Primary Topic
Neutrino Physics Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Testing the PMTs Underwater Units with a new pressure vessel for the Hyper-K experiment

Zenodo (CERN European Organization for Nuclear Research)
Neutrino Physics Research
article

Testing the PMTs Underwater Units with a new pressure vessel for the Hyper-K experiment

article en

Abstract

Poster presented at the XXI International Workshop on Neutrino Telescopes - Padova 29 September - 3 October 2025 (https://agenda.infn.it/event/44606/) Abstract: The Hyper-Kamiokande (HK) neutrino experiment is currently under construction in Japan, with data taking scheduled to begin in early 2028. The detector will be a huge tank filled with 258 kton of ultrapure water divided into Inner Detector (ID) and Outer Detector (OD). More than 20000 50-cm PMTs and 800 multi-PMTs will face the inside of the ID, while the OD will be equipped with approximately 3600 8-cm PMTs to provide the veto for the ID. Next year, an intense assembly phase will be carried out at CERN, where the Underwater Units (UU) housing the electronics of PMTs will be assembled, tested and validated for shipment to Japan. A newly developed test vessel will evaluate both ID and OD UUs under the same pressure and thermal conditions as the final detector. The fully automated tests will verify the tightness of new feed-throughs and mechanical components, and will monitor internal pressure, temperature, and humidity, with all data stored in the HK database.

Zenodo (CERN European Organization for Nuclear Research)
University of Padua (IT), Istituto Nazionale di Fisica Nucleare (IT)
Openalex Percentile: Top 26%
Neutrino Physics Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.