Upgrading Fermilab’s accelerator control system with ACORN

The Fermilab Accelerator Complex is the largest national user facility in the Office of High Energy Physics (DOE/HEP) program and the only national user facility operating at Fermilab. Fermilab serves as the host to the Long Baseline Neutrino Facility/Deep Underground Neutrino Experiment (LBNF/DUNE), the laboratory’s flagship project for neutrino science that is under construction. LBNF/DUNE will be powered by megawatt beams from an upgraded accelerator, the Proton Improvement Plan II (PIP-II) that will replace the laboratory’s aging linear accelerator with a new one based on superconducting radio-frequency cavities. The Accelerator Controls Operations Research Network (ACORN) Project will support LBNF/DUNE and PIP-II by modernizing the accelerator control system. The project is at the conceptual design phase and looking to achieve Critical Decision 1 (CD-1) later this year. The scope and structure of the project will be presented, along with an overview of how that has changed in the past year. Current design and technology choices will be shared. Specific challenges facing the project will be addressed, along with current thinking on solutions.

Publication Details

Journal
JACOW
Published
2025-12-05
DOI
https://doi.org/10.18429/jacow-icalepcs2025-moag005
Primary Topic
Particle accelerators and beam dynamics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Upgrading Fermilab’s accelerator control system with ACORN

JACOW
Particle accelerators and beam dynamics
article

Upgrading Fermilab’s accelerator control system with ACORN

article en

Abstract

The Fermilab Accelerator Complex is the largest national user facility in the Office of High Energy Physics (DOE/HEP) program and the only national user facility operating at Fermilab. Fermilab serves as the host to the Long Baseline Neutrino Facility/Deep Underground Neutrino Experiment (LBNF/DUNE), the laboratory’s flagship project for neutrino science that is under construction. LBNF/DUNE will be powered by megawatt beams from an upgraded accelerator, the Proton Improvement Plan II (PIP-II) that will replace the laboratory’s aging linear accelerator with a new one based on superconducting radio-frequency cavities. The Accelerator Controls Operations Research Network (ACORN) Project will support LBNF/DUNE and PIP-II by modernizing the accelerator control system. The project is at the conceptual design phase and looking to achieve Critical Decision 1 (CD-1) later this year. The scope and structure of the project will be presented, along with an overview of how that has changed in the past year. Current design and technology choices will be shared. Specific challenges facing the project will be addressed, along with current thinking on solutions.

JACOW
Openalex Percentile: Top 29%
Particle accelerators and beam dynamics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Upgrading Fermilab’s accelerator control system with ACORN · JACOW (2025) | TGRS Research Map | TGRS